My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2300 - Underground Storage Tank Program
>
PR0231126
>
COMPLIANCE INFO_2008-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2024 1:24:34 PM
Creation date
6/23/2020 6:44:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2010
RECORD_ID
PR0231126
PE
2361
FACILITY_ID
FA0001570
FACILITY_NAME
UNITED # 5447
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
01
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231126_1469 E HAMMER_2008-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN— PAGE 1 (One form per facility) <br /> R01 <br /> IYPE OF ACTION ❑ L NEW PLAN ® 2 CHANGE OF INFORMATION <br /> I. FACILITY INFORMATION <br /> FACILITY ID# (Agency Use Only) 1 <br /> BUSINESS NAME(Same as FACILITY NAME) 3 <br /> CRLLC #2705447 <br /> BUSINESS SITE ADDRESS 103 1 BUSINESS SITE CITY t04 <br /> 1469 E Hammer Lane Stockton, CA 95210 <br /> II. SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan(HMBP) <br /> If safe to do so,facility personnel will take immediate measures to control or stop any release(e g,activate pump shut-off,etc)and, if necessary,safely remove <br /> remaining hazardous material from the USI system <br /> ➢ Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste <br /> ➢ Absorbent material will be used to contain and clean up manageable spills of hazardous materials Absorbent material which has become too saturated to be <br /> effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262 11 finds that <br /> it is non-hazardous Used absorbent material, reusable or waste,will be stored in a properly labeled and sealed container Waste material shall be disposed of <br /> appropriately. <br /> ➢ Facility personnel will determine whether any water removed from secondary containment systems, or from clean-up activity, has been in contact with any <br /> hazardous material If the water is contaminated, it will be managed as hazardous waste unless a hazardous waste determination in accordance with 22 CCR <br /> §66262 11 finds that it is non-hazardous If the water has a petroleum sheen(i e,rainbow colors), it is contaminated A thick floating petroleum layer may not <br /> necessarily display rainbow colors Water(hazardous or non-hazardous)from sumps,spill containers,etc will not be disposed to storm water systems. <br /> ➢ We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br /> 1 Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2 Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3 Hazardous material, other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment <br /> ITL SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE: Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan This <br /> equipment is inspected at least monthly,and after each use,supplies are replenished as needed. Defective equipment is repaired or replaced as necessary, <br /> EQUIPMENI NOT PERMANENTLY ON-SITE,BUT AVAILABLE FOR USE IF NEEDED: (Complete nly If applicable) <br /> EQUIPMENT LOCATION AVAILABILITY <br /> RIO R20 R30 <br /> RIl R21 R31 <br /> R12 R22 P32 <br /> R13 R23 R33 <br /> R14 R24 R34 <br /> RIS R25 R35 <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME R40 TITLE RSo <br /> Chuck J. Softich Manager of Compliance& Maintenance <br /> NAME R41 TITLE Rst <br /> Dennis Tweedy Maintenance&Compliance Manager <br /> NAME R42 TITLE R52 <br /> NAME R43 I TITLE R53 <br /> V. MONITORING INDICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> ❑1 ADDITIONAL SYSIEM TESTING OR DATA COLLECTION ❑2 INSPECTION BY QUALIFIED PERSONS ❑3 RECALIBRATION OF EQUIPMENT Rho <br /> ❑99 OT14ER(Specify): R61 <br /> UN-022B-113 www.unidocs.org Rev.04/02/08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.