Laserfiche WebLink
C <br />1 i 110 <br />)11 1 <br />SWRCB, January 2006 <br />This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and <br />printouts from tests (if applicable) should be provided to the facility owner/operator for submittal to the local regulatory agency. <br />1. FACILITY INFORMATION <br />Facility Name: CRLLC #2705447 1 Date of Testing: AUG 5, 2009 <br />Facility Address: 1469 E. HAMMER LANE, STOCKTON, CA 95210 <br />Facility Contact: CHUCK SOFTICH I Phone: (253) 437-5980 <br />Date Local Agency Was Notified of Testing: JUL 24, 2009 <br />Name of Local Agency Inspector (f present during testing): GARRETT BACKUS <br />2. TESTING CONTRACTOR INFORMATION <br />Company Name: TANK-TEK ENVIRONMENTAL CORPORATION <br />Technician Conducting Test: MIKE LAWRENCE <br />Credentialsl: ® CSLB Contractor ® ICC Service Tech. ® SWRCB Tank Tester ❑ Other (Spec) <br />License Number(s): 803705 (CSLB Contractor) -- 1048103 -UT (ICC Service Tech.) -- 90-1200 (SWRCB Tank Tester) <br />3. SPILL BUCKET TESTING INFORMATION <br />Test Method Used: ® Hydrostatic ❑ Vacuum ❑ Other (Spec) <br />Test Equipment Used: VISUAL Equipment Resolution: <br />Identify Spill Bucket (By Tank <br />Number, Stored Product, etc.) <br />91 FILL <br />89 FILL 87 FILL <br />DIESEL FILL <br />Bucket Installation Type: <br />® Direct Bury <br />❑ Contained in Sump <br />® Direct Bury ® Direct Bury <br />❑ Contained in Sump ❑ Contained in Sump <br />® Direct Bury <br />❑ Contained in Sump <br />Bucket Diameter: <br />11.50" <br />11.50" 11.50" <br />11.50" <br />Bucket Depth: <br />15.00" <br />14.00" 14.50" <br />15.00" <br />Wait time between applying <br />vacuum/water and start of test: <br />0 <br />0 0 <br />0 <br />Test Start Time (TI): <br />10:00 AM <br />9:00 AM 9:00 AM <br />12:00 PM <br />Initial Reading (RI): <br />13.50" <br />12.50" 13.00" <br />13.50" <br />Test End Time (TF): <br />11:00 AM <br />10:00 AM 10:00 AM <br />1:00 PM <br />Final Reading (RF): <br />13.50" <br />12.50" 13.00" <br />13.00" <br />Test Duration (TF — TI): <br />1 HR <br />1 HR 1 HR <br />1 HR <br />Change in Reading (RF - Rj): <br />0 <br />0 0 <br />Pass/Fail Threshold or Criteria: <br />Test Result. <br />Z Pass ❑ Fail <br />I ® Pass ❑ Fail ® Pass ❑ Fail <br />❑ Pass Z Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />DIESEL -- REMOVED DROP TUBE USED TEST BALL -- DRAIN GOOD <br />HOLE IN BUCKET OR BAD BOTTOM CLAMP <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />I hereby certify that all the information contained in this report is true, accurate, and in full compliance with legal requirements. <br />Technician's Signature <br />Date: AUG 5, 2009 <br />1 State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements <br />may be more stringent. <br />