Laserfiche WebLink
E <br />F. In -Tank Gauging / SIR Equipment: <br />® Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />❑ Yes <br />I ❑ No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ Yes <br />❑ No* <br />Were all tank -gauging probes visually inspected for damage and residue buildup? <br />❑ Yes <br />❑ No* <br />Was accuracy of system product level readings tested? <br />❑ Yes <br />❑ No* <br />Was accuracy of system water level readings tested? <br />❑ Yes <br />❑ No* <br />Were all probes reinstalled properly? <br />❑ Yes <br />❑ No* <br />I Were all items on the equipment manufacturer's maintenance checklist completed? <br />n to the Section H, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): <br />Complete the following checklist: <br />❑ Check this box if LLDs are not installed. <br />® Yes <br />❑ No* <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />❑N/A <br />Check all that a 1 Simulated leak rate: ®3 ..h. ❑ 0.1 g.p.h ; ❑ 0.2 .h. <br />® Yes <br />❑ No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />® Yes <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />® Yes <br />El No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ N/A <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />® N/A <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />® N/A <br />or disconnected? <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br />® N/A <br />malfunctions or fails a test? <br />❑ Yes <br />❑ No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />® N/A <br />® Yes <br />❑ No* I <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: <br />Page 3 of 3 <br />Monitoring System Certification <br />