My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2300 - Underground Storage Tank Program
>
PR0231126
>
COMPLIANCE INFO_2008-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2024 1:24:34 PM
Creation date
6/23/2020 6:44:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2010
RECORD_ID
PR0231126
PE
2361
FACILITY_ID
FA0001570
FACILITY_NAME
UNITED # 5447
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
01
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231126_1469 E HAMMER_2008-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of Xull <br />SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />x <br />600 East Main Street, Stockton, CA 95202-3029 <br />Telephone: (209) 468-3420 Fax. (209) 468-3433 Web: www.siaov.org/ehd <br />foldl Polo <br />F plity Name: <br />ILI -70#�� <br />% #- T <br />Inspection Date: <br />t(.05 <br />Facility Address: I <br />Lf61 c-- . I <br />I-- 6VWV 24" C () <br />Service Request #: <br />�*M517iffl <br />ite Se ice Technician's Name: <br />ICC Service Technician/installer Exp. Date: <br />11A It9010 <br />Manufacturer Training: <br />ON Lf -14 AA11 <br />SERVICE <br />d'IM Spill bucket <br />Leak detector <br />❑ <br />El mechanical Model: <br />El Incon TS -STS <br />0 electronic Serial #: <br />0 Caldwell System <br />11 line test programmed <br />Leak detector <br />0 <br />0 mechanical Model: <br />0 1 hour hydrostatic <br />El electronic Serial #: <br />El line test programmed <br />0 Other <br />Leak detector <br />El <br />0 mechanical Model: <br />0 <br />0 electronic Serial #: <br />El Incon TS -STS <br />0 line test programmed <br />0 Caldwell System <br />sensor <br />El <br />0 positive shutdown Model: <br />0 fail safe Serial <br />Psi <br />0 NA <br />sensor <br />❑ <br />0 positive shutdown Model: <br />Secondary containment testing for: <br />0 fail safe Serial #: <br />UDC(s) <br />DNA <br />sensor <br />El <br />El positive shutdown Model: <br />Testing for the above components are next due by: <br />• fail safe Serial <br />Note: Please be aware that 21 containment components are required to be tested upon <br />installation, 6 months after, and every 36 months thereafter. <br />• NA <br />o <br />Drop tube with mechanical overfill at 95% <br />El <br />Drop tube with mechanical overfill at 95% <br />El <br />Overfill prevention (see LG letter 150-1) <br />SERVICE I <br />EHD 23-04 <br />Rev 11/17//08 <br />UST SERVICE REQUEST INSPECTION REPORT <br />d'IM Spill bucket <br />El minimum 5 gallon <br />29 <br />0 1 hour hydrostatic <br />El Incon TS -STS <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br />0 Caldwell System <br />PY Other coym <br />Spill bucket <br />0 minimum 5 gallon <br />El <br />0 1 hour hydrostatic <br />El Incon TS -STS <br />0 Caldwell System <br />0 Other <br />- Spill bucket <br />0 minimum 5 gallon <br />0 <br />0 1 hour hydrostatic <br />El Incon TS -STS <br />0 Caldwell System <br />0 Other <br />Primary piping testing at: <br />11 <br />Psi <br />minutes <br />Secondary containment testing for: <br />UDC(s) <br />Piping <br />Sump(s) <br />LIST(s) <br />❑ <br />Testing for the above components are next due by: <br />Note: Please be aware that 21 containment components are required to be tested upon <br />installation, 6 months after, and every 36 months thereafter. <br />El <br />Cold start of monitoring panel <br />Corrosion protection <br />❑ <br />Other: see below <br />EHD 23-04 <br />Rev 11/17//08 <br />UST SERVICE REQUEST INSPECTION REPORT <br />07. CAAMlIM, a NO 1� <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br />EHD Inspec r- <br />ZAP4 <br />EHD 23-04 <br />Rev 11/17//08 <br />UST SERVICE REQUEST INSPECTION REPORT <br />
The URL can be used to link to this page
Your browser does not support the video tag.