Laserfiche WebLink
Monitoring System Certification <br /> F P 2017 <br /> UST Monitoring Site Plan <br /> Site Address: United Pacific#6447–1469 E Hammer Lane Stockton CA 95210 <br /> STORE <br /> 6. . . . . . . . . . 8 . . . . <br /> .5 . . . . . . .7 . . . . . . . . . . <br /> a <br /> 2 <br /> M <br /> M <br /> e <br /> r 3 <br /> o 0 0A <br /> L <br /> a <br /> n v <br /> KEY DSL 87 89 91 <br /> e T=—ANNULAR <br /> F=FILLS <br /> T=TURBINE <br /> P=PROBE <br /> V=VAPOR <br /> X=SUMP SENSOR <br /> L=LD r T <br /> M Manway T P <br /> P <br /> B Brine Sensor ( 9 E e <br /> 1� P x x <br /> I=Smart Sensor X <br /> . . . . . . . . . . <br /> S=STP <br /> C=Floats&Chains <br /> E–E Stop <br /> Date map was drawn:8-11-16 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors,-and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 2/21/07 <br />