Laserfiche WebLink
SWRCB, January 2006 <br />Spill Bucket Testing Report Form <br />This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and <br />printouts from tests (if applicable) should be provided to the facility owner/operator for submittal to the local regulatory agency. <br />Facility Name: CRLLC #5447 Date of Testing: 7/21/2014 <br />Facility Address: 1469 E HAMMER LANE, STOCKTON, CA 95209 <br />Facility Contact: ALLEN FAASS I Phone: (925) 884-0800 <br />Date Local Agency Was Notified of Testing: 7/1&14 <br />Name of Local Agency Inspector (rf present during testing): STACY <br />Company Name: TANK TEK ENVIRONMENTAL CORPORATION <br />Technician Conducting Test: RICHARD THOMAS <br />Credentials: ® CSLB Contractor ❑ ICC Service Tech. ❑ SWRCB Tank Tester ❑ Other (Spec) <br />License Number(s): 803705 (CSLB Contractor) — 5254736 -UT (ICC Service Tech.) — 06-1672 (SWRCB Tank Tester) <br />' State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements <br />may be more stringent. <br />3. SPILL BUCKET TESTING INFORMATION <br />Test Method Used: <br />® Hydrostatic <br />❑ Vacuum <br />❑ Other (Specify) <br />Test Equipment Used: VISUAL - TAPE MEASURE <br />Identify Spill Bucket (By Tank <br />Number, Stored Product, etc.) 91 FILL <br />Bucket Installation Type: ® Direct Bury <br />❑ Contained in Sump <br />88 FILL <br />® Direct Bury <br />❑ Contained in <br />Equipment Resolution: <br />87 FILL <br />® Direct Bury <br />Sump ❑ Contained in Sump <br />1/16" <br />DIESEL FILL <br />® Direct Bury <br />❑ Contained in Sump <br />Bucket Diameter: <br />12" <br />12" <br />12" <br />12'1 <br />Bucket Depth: <br />15" <br />14" <br />13.75" <br />14.75" <br />Wait time between applying <br />vacuum/water and start of test: <br />10 MIN <br />10 MIN <br />10 MIN <br />10 MIN <br />Test Start Time (TO: <br />8:30 AM <br />8:30 AM <br />8:30 AM <br />12:25 PM <br />Initial Reading (RD: <br />13.50" <br />12.50" <br />12.25" <br />13.25" <br />Test End Time (TF): <br />9:30 AM <br />8:30 AM <br />9:30 AM <br />12:40 PM <br />Final Reading (RF): <br />13.50" <br />12.50" <br />12.25" <br />13.25" <br />Test Duration (TF— Tj): <br />15 MIN <br />15 MIN <br />15 MIN <br />15 MIN <br />Change in Reading (RF- Ra: <br />0 <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or Criteria: <br />NO LOSS <br />NO LOSS <br />NO LOSS <br />NO LOSS <br />COMMent3 — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />REPLACED DRAIN VALVE AT DIESEL SPILL BUCKET <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />I hereby certify that all the information contained in this report is true, accurate, and in full compliance with legal requirements. <br />Technician's Signature: �--& v—� Date: 7/21/2014 <br />' State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements <br />may be more stringent. <br />