Laserfiche WebLink
1 0 9 <br />F. In -Tank Gauging 0 SIR Equipment: 0 Check this box if tank gauging is used anPy far inventory control. <br />0 Check this box if no tank gauging or SIR OgLoprnentis installed <br />This section must be completed it an -lank gauging equipment is used 10 perform leak detection monitoring. <br />Complete the following chocklist. <br />0 Yes <br />❑ <br />140. <br />Has all input wiring own ins ted for proper entry and lerminat-on. including testing for ground faults? <br />❑ Yes <br />❑ <br />NV <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes <br />0 <br />NO' <br />Was, ac"Tacy of alratem product level readins tested? <br />D Yes <br />❑ <br />No' <br />was a=raGy of system water Level readings tested? <br />L11 Yes <br />❑ <br />No' <br />I Were all probes reinstalled properly? <br />0 <br />MIA <br />bection H, bel0M deScribe how and when these deficiencies were or will be corrected, <br />Line Leak Detectors. (LLD): Chack this box if 1.1.0s; are not installed. <br />fl—F.P. th. <br />0 Yes <br />[3 <br />N;: <br />F01 equipment startor annual equipmeril certirication. was a leak simulated 10 verify LLD performance? (Check air "I appFr) <br />.9 <br />[I <br />NtA <br />Simulated leak role: 3 g -ph.: 001g.p.h,, 00-2g.p.h, <br />0 Yes <br />0 <br />No* <br />Were an LLDs confirmed operational and accurate within reSulatory requirements? <br />0 Y L's <br />Ne <br />Was the testing apparatus properly calibrated? <br />0 Yes <br />0 <br />No' <br />For mechanical LLDs. does the LLD restrict product flow if it de eons a leak? <br />0 <br />MIA <br />Yes <br />0 <br />No- <br />For electrenic LLDs, does the turbine au-omaticaiiy shut oil if the LLD detects a leak) <br />0 <br />NA <br />0 Yes <br />0 <br />No' <br />For et is LLDs, does the turbine automatically shut Off if any portion of the monitoring system is disabled or d4connected? <br />[I <br />NIA <br />0 Yes <br />0 <br />No* <br />For eleelronc LLD9, does the turbine a utornalically shut off if any portion of the monitoring system malfunctions or fails a test? <br />0 <br />WA <br />0 Yes <br />0 <br />NO' <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />0 <br />NA <br />0 Yes <br />Were all it on the equipment manufacturer's maintenance checklist completed? <br />,. --i r*, —, uwa—um -zvw wlh- wmiti vivau uvia iwimm4 wvfqr Fir Win wu cumecreo. <br />H. <br />