Laserfiche WebLink
'D- Results ofTestingfServicing <br />So re Version installed: 329.01 <br />rnmirilata the h—un". <br />0 Yes <br />Is the audi—ble, alan-n—op--et-a—lona-17— <br />G) Yes <br />0 No* <br />Is the visual alarm operational? <br />—Were <br />EI yes— <br />13 No' <br />—�NO' <br />all sensors visuiety inspectod. funclionalld]i—nq =C(Mfilmed -operational? <br />Ethe-ir <br />0 Yes— <br />Were all sonsoce installed at lowest point Of secondary Containment and POSitiOned 50 that 01W equipment will ra interfere with pvc]oper <br />0 Yes <br />0 No, <br />if Mrm are rerayeo to a demote monitoring station, is an communications, equipment (e.g. modem) operational? <br />9 WA <br />Yes <br />0 No' <br />For pressurized piping system does the turt:iine automatically Shut down if the piping secondary containment monitiormg system detects a leak. <br />❑ NIA <br />fails to operate, or is electrically disconnected? If ye& which sensors rnitiale positive strut -dorm? (oneo aff Mal apply) 0 Sumpfftench <br />Sensors; 0 OrWitser Containment Sensors <br />Cho you confirm pos4ve shul-dowiri due to looks aO sensor failurejOisconnWiw? 0 Yes; 0 No - <br />0 Yes <br />0 No' <br />IWA <br />for tank systems tmt utilize the morutorft system as Vic Primary tank overfill warning device (i.e., no nifthanical overfill Prevention vahoe is <br />ieagla. is the Overfill warning alarm visible and audible at the tank rill poings) and operating property? it six al wh9j percent of tank capacity <br />—ff— <br />does Vie alarm trigger? % <br />Y <br />NO <br />Was any Monitoreng equiWneirvt replaced? If yes. identify specific sensors, probes, or other equipment replaced and list the manufacturer name <br />and modV for all replacement parts in Section E; below- <br />15yes' <br />0 No <br />Was liquid found insAe any secondary con-taintimni systems aesigned as dry systems' IChOO a?1 that appyl <br />C) Product; El Water. If yes. describe causes in Seclion E, below. <br />0 yes <br />0 No* <br />Was monitoring system set-up reviewed to ensure proper settings? Attach set up reports. if applicable <br />E) Yes <br />11 No' I <br />Is all monitoring equipment operational per manufacturees specifficallons) <br />• In Section E below, descrIbe how and when these doficlen cies were or will be corrected. <br />E. Comments. 5/19117 Retested 91 Float onPL sp3/4. Did not pass again, neqds�air and retest - <br />Monitoring System Certificavon <br />Page 2 of 2 <br />2.1-71/07 <br />