Laserfiche WebLink
0. Results ofTesting/Servicing <br />Software Version Installed. 329.01 <br />rnm rilpto M& 1^1 1A,.i­ K— Viae. <br />0 Yes <br />0 No. <br />Is the audible alarm operational? <br />Yes <br />D No* <br />—5 <br />13 the Visual alarm opera anal? <br />Yes <br />Na' <br />Were all senSM visually MSPWed, fun ally tested, and confirmed operational? <br />Yes <br />U No' <br />Were all SenSOM ihStat5ed at lowest point of secondary containment and positioned so that other equi ilt wilt not interfere YA.h their propeir <br />operaWn? <br />D Yes <br />No' <br />It alarms OM relayed to a remote m=40(ing station. is all communications equipment (e.g.. modern) <br />NA <br />Operational? <br />M Yes <br />0 No- <br />For pressurized piping systems. does the JurWL, automatically shut (town if the piping 50=001y containment monitoring System detects a leak. <br />❑ WA <br />fails to operate, or is electrically lisConnacted? If Yes whiClll sensors initiate positive shut -down) (check all that appry) 0 SumoMe"ch <br />Sensors; 0 Pispenset Containment Sensors <br />Did YOU Confirm POWWO SlIMI-dom due 10 teaks and sensor failureldiscoonection? 0 Yes; 0 No. <br />1 0 Yes <br />El No" <br />For lank systems Vial utilize the monitoring System as the primary lank overfill warning device (i.e., no mechanical overfill prevention valve as <br />MA <br />inslage0l), is the overfill warning alarm v*ble and audible at the tank fill points} and operating property? if W, at wnal percent of Lank capacity <br />—ye. <br />does M alarm trigger? % <br />No <br />WAS 8nY ;O;Orlrtg equipment MPIaCed? tr yes. idOnth SP-Cift sensors. Probes. Or Other ecti.Ppment repilaced list the <br />and manuractwer name <br />and model for at] replacement pans in S&ton E. tialow <br />0yes, <br />IR No <br />VMS liquid found inside any secondary containment systems designed as dry systems? (Check am Thal apply) <br />El Product; [3 Water- It yes. describe causes in Section E. below <br />Yes <br />No' <br />Was Monitoring system set-up reviewed to ensigre PrOW settings? Attach set up reports. if appLicable <br />La Y&ST <br />C3 Nd' , <br />Is all monitoring eqi_pm_cnl operational per manufacturer's specificationS7 ........ . .... .... <br />In Section E betow, deSCM)e how and when these defleilincles wore or will be cormetod. <br />F. Comments: 91 Float Disp fie dS repair and retest, <br />Also, Float on [Dose and retested <br />