Laserfiche WebLink
rpL,, <br />Monitoring System Certification <br />wiAY 2 2 0 17 UST Monitoring Site Plan <br />C!§its Prt!K w s� t' per. , PAyMQ2P VALERO 1612 W. HAMMER LANE STOCKTON CA 95210 <br />KEY i R T 177711. <br />A = ANNULAR <br />F = FILLS . . <br />T = TURBINE <br />P = PROBE . <br />V = VAPOR . . <br />X = SUMP SENSOR . <br />L = Leak Detector . . . 2 <br />M = Manway <br />B = Brine Sensor . . . 1 <br />I = Smart Sensor <br />S = STP <br />C = Floats & Chains <br />E = E Stop <br />.................. <br />.................. <br />.................. <br />.................. <br />.................. <br />FLOATS & CHAINS IN DISP. . . . . <br />. . . . . . .4 . <br />=. . . . . . . . 3. <br />1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8. . . . <br />........................................... x x <br />T) <br />................................................ n n <br />7. <br />x8. . . . . <br />...................................................DIE.............. <br />Date map was drawn: 5-19-17 <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring System Certification. On your site plan, <br />show the general layout of tanks and piping. Clearly identify locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank <br />annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in -tank liquid level <br />probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br />Monitoring System Certification Page 4 of 4 2/21/07 <br />