Laserfiche WebLink
1612 W. Hammer Ln, Stockton, CA 95209 Record ID PR0231127 <br />5/17/16 PHOTO # 2 <br />Q .&Adftn Zip Code: 95209 <br />Gomez r <br />in[t"tslltionsl OW OWN ,,g- Expiration Date' 4/14!24 V <br />atut „r" Phone: (949)460-5,111, <br />ttm ni HISTORY <br />1.... M0ni[OringSysiatt5s=pttwe and in pt'tlpr -ting mode '.,. <br />�...... �. <br />2 hlommnng �pttl�eurrlitly sllo vmg any aims Or wamings. <br />3 Alarm histmy4vp6M6i'ff r,, itepreviou nlunth 'k available, and has been reviewed by the Designated USI <br />Operator- (46c1h a copy ofthe alarm his orulog to this form if available.) <br />4 Each alarm for the previous month has been responded to appropriately. <br />X_ <br />5 Sensors located in tank -top containment sumps have not alarmed in the past month. <br />x <br />5a List all tauk-top sumps where alarms occurred in the past month: <br />Note- Sumps xhare an alatrn has occurred in the pasl month oust be inspected unless a qualified serine technician responded to <br />and prnpmj <br />eAd, sed, rhe raps¢oftho ulpm7-,.tlfar;A da��.renmrion-r�ingapproprinte.service to th-eport. ff wap m,peclmn isrequi <br />r p, + er rd ro.hs <br />fn mem d beton ` <br />UST SYSTEM INSPECTION <br />6 =` rank -top o Adornment sumps are free of water, debris, and hazardous substance. Sensors are located properly <br />.r:r <"iry, re<f "r rhrposr monrh far,.h"rr rhe. ,..t <br />Sump � XX _ I <br />(Stoup Loc4Xiat <br />- — <br />Sr+mp LacaXron <br />Sum Location "^ <br />p <br />_ _—L— <br />Sump Location. <br />Sump Location. <br />Spilt coniammu t structures are ¢rte of Nater, debris, and hazardous substance. <br />a <br />Y <br />N NA <br />Y <br />�; <br />x Tank -Diesel _ <br />x , <br />_ <br />gisk-6' <br />TWA 9i x <br />ppfauunent areas are free of water debris, and hazardous substance. Sensors are located prof erny ' <br />.,. .. yN <br />i)xspexsar Ila x <br />Dispenscr ?'4 x <br />x C,te <br />i"�_ <br />Dispenser- r -b <br />prf%RWORK IIVSPECTION Y N 11A <br />9 4fonitiiring 'ystcm e °been completed within past 12 months. x <br />4 <br />}pr-� Secondary contanun "n completed within the required timeframe. x <br />I 1 Spill containment stractd et) testing was completed within the past year. X <br />12 Tank lightness testing was'' pleted within required timeframc. x <br />v <br />- <br />Nra <br />13 Line tightness testing was completed within required timeframe. X <br />Other testinhhnairucriance was completed within required timeframe. (List test/maintenXlce items below) <br />14 required <br />Yt <br />TesilA4airrtenance, <br />x <br />gra <br />r Tes lfA'fU111/ertGnC@: ----� <br />x <br />hti <br />T,-, f/Ha in tenance. <br />FACILITY EMPLOYEE TRAINING <br />15 All facility employees have received the required un -the -job training within the past year. _ <br />16 All faciiinr employees hircd withal the past 30 days have received the required on -the -jab training r <br />r u rw ,ri <br />Fatinah Zareef, REHS Page 2 of 2 <br />