My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1612
>
2300 - Underground Storage Tank Program
>
PR0231127
>
COMPLIANCE INFO_2010-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 2:55:56 PM
Creation date
6/23/2020 6:44:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2018
RECORD_ID
PR0231127
PE
2361
FACILITY_ID
FA0003611
FACILITY_NAME
PARKWOODS GAS & FOOD
STREET_NUMBER
1612
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07728002
CURRENT_STATUS
01
SITE_LOCATION
1612 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231127_1612 W HAMMER_2010-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
427
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Title 23, CCR 2715(e) Designated operator monthly inspection monthly reports <br />not maintained on site for at least 12 months. The owner or operator shall maintain a <br />copy of the monthly inspection record and all attachments for the previous twelve <br />months. The records shall be maintained on-site or, if approved by the local agency, off- <br />site at a readily available location. <br />4 The July 2009 through June 2010 designated operator monthly inspection <br />reports were not found on site during the July 20, 2010, routine UST inspection <br />report. <br />Title 23, CCR 27150 Designated operator employee training not performed. By <br />July 1, 2005, and every twelve months thereafter, the designated UST operator(s) shall <br />train facility employees for which he or she is responsible in the proper operation and <br />maintenance of the underground storage tank system. For facility employees hired on or <br />after July 1, 2005, the initial training shall be conducted within 30 days of the date of <br />hire. <br />(1) The training for facility employees must include, but is not limited to: <br />(A) The operation of the underground storage tank system in a manner consistent <br />with the facility's best management practices. <br />(B) The facility employee's role with regard to the monitoring equipment as specified <br />in the facility's monitoring plan. <br />(C) The facility employee's role with regard to spills and overfills as specified in the <br />facility's response plan. <br />(D) The name of the contact person(s) for emergencies and monitoring equipment <br />alarms. <br />(2) At least one of the facility employees present during operating hours shall have <br />current training in accordance with subdivision (f)(1). For facilities that are not <br />routinely staffed, the designated UST operator shall implement a facility employee <br />training program approved by the local agency. <br />(3) A list of facility employees who have been trained by the designated UST <br />operator(s), shall be maintained on-site or off-site at a readily available location, if <br />approved by the local agency. The list shall be provided to the local agency upon <br />request. The list shall include the dates of training for all facility employees, and the <br />hiring dates for all facility employees hired on or after July 1, 2005. <br />4 Employee Gulzaman George did not have current training by the designated <br />operator during the July 20, 2010, routine UST inspection. <br />V. ATTACHMENTS <br />Attachment 1 -August 11, 2009, routine UST inspection report <br />Attachment 2 - Photos taken during August 27, 2009, routine UST inspection <br />Attachment 3 - August 11, 2009, monitoring system certification test report <br />Attachment 4 - September 3, 2009, email to Mr. Barnhart <br />Attachment 5 - Revised pages 1 and 2 for August 11, 2009, monitoring system <br />certification test report <br />Attachment 6 - Permit application SR0058040 <br />Attachment 7 - July 20, 2010, routine UST inspection report <br />Attachment 8 - August 24, 2010, follow up letter to July 20, 2010, routine UST <br />inspection report <br />Attachment 9 - September 17, 2010, Notice to Abate Immediately <br />Attachment 10 - Items submitted in response to August 24, 2010, follow up letter <br />.D <br />
The URL can be used to link to this page
Your browser does not support the video tag.