Laserfiche WebLink
Monitoring System Certification <br />11,: a yu <br />Software Version Installed: <br />Complete the following checklist: <br />es <br />❑ No* <br />Is the audible alarm operational? <br />Pll�es <br />❑ No* <br />Is the visual alarm operational? <br />EaKyes <br />❑ No* <br />Were all sensors visually inspected, functionally tested, and confirmed operational? <br />E14es <br />❑ No* <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br />not interfere with their proper operation? <br />❑ Yes <br />❑ No* <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g., modem) <br />11 <br />/A <br />operational? <br />Q/yes <br />❑ No* <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br />❑ N/A <br />monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br />positive shut -down? (Check all that apply) ump/Trench Sensors; B44ispenser Containment Sensors. <br />Did you confirm positive shut -down due to leaks and sensor failure/disconnection? s; ❑ No. <br />❑ Yes <br />❑ No* <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e., no <br />mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br />fill point(s) and operating properly? If so, at what percent of tank capacity does the alarm trigger? % <br />❑ Yes* <br />Rlfio <br />Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced <br />and list the manufacturer name and model for all replacement parts in Section E, below. <br />❑ Yes* <br />No <br />Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br />❑ Product; ❑ Water. If yes, describe causes in Section E, below. <br />No* <br />Was monitoring system set-up reviewed to ensure proper settings? Attach set up reports, if applicable <br />[Eyes0 <br />Yes <br />No* <br />Is all monitoringa ui ent o rational per manufacturer's s ecifications? <br />* In Section E below, describe how and when these deficiencies were or will be correctedL <br />E. Comments: <br />Page 2 of 4 <br />UN -036 —214 www.unidoc"rg Rev. 01/17108 <br />