Page 2 of 2 <br />0 is <br />Hello Mark, <br />Per our phone conversation this morning, It is allowed if holes must be cut in the drainage <br />louvers only when conduits must come up through this area. When done, the hole must <br />conform to the O.D. of each conduit as closely as possible. Proper surface prep and a thick <br />application of Vulkem 116 polyurethane sealant must follow. <br />Conversion Frames would not have been necessary, nor this step of cutting holes in the <br />conversion frame, if the contractor doing the initial installation had not concreted over the <br />Interchangeable Dispenser Frame. If possible, I would like to know who that initial contractor <br />was. <br />Thank you. <br />Jonathan Smith <br />S. Bravo Systems, Inc. <br />From: Mark Vendeiro [mailto:m.vendeiro@att.net] <br />Sent: Thursday, September 01, 2011 2:22 PM <br />To: Jonathan Smith <br />Subject: conversion frame problem <br />John, <br />Please take a look at the attached photo. <br />Mark Vendeiro <br />MVP Petroleum Engineering, Inc. <br />mvpeng@att.net <br />916-205-1537 <br />9/2/2011 <br />