Laserfiche WebLink
MW UNIFIED PROGRAM CONSOLIDATED FO <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN (Page 2 of 2) <br />VI. UNDER DISPENSER CONTAINMENT (UDC) MONITORING <br />WC MONITORING IS PERFORMED USING THE fOLLOWING METHOD <br />r o <br />490-54b <br />..-• a.�,vi.iu.uvva ua.c:�,awvly i�. lvivlvia W-11 l KJ G. CLVt%I A1tliJl,r1A11MAJJC1v1DL Y U J.GLLt, I KU1N11, J 1 AINIJ-ALU1Nt1 <br />❑ 4. NO DISPENSERS ❑ 99. OTHER ci ): <br />PANEL MANUFACTURER: o j® ago ss <br />MODEL #: fd 490 56. <br />LEAK SENSOR MANUFACTURER 11 i a, gt 457 <br />1 MODEL #(S): 490'59 <br />DETECTION OF A LEAK INTO THE UbC TRIGGERS AUDIBLE AND VISUAL ALARMS a. YES ❑ b. NO 490-59 <br />UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN 9 a. YES ❑ b. NO 490-60 <br />FAILURE / DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. a. YES [3b. NO 49"] <br />�0,/ <br />UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER YJ a. YES ❑ b. NO 49x62 <br />2. UDC CONSTRUCTION IS J@ 1. SINGLE -WALLED ❑ 2. DOUBLE -WALLED 490.63 <br />IF DOUBLE WALLED: 490.64a <br />UDC INTERSTITIAL SPACE IS MONITORED BY: 0 1. LIQUID 2. PRESSURE 3. VACUUM <br />A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a. YES ❑ b. NO 490.646 <br />VII. PERIODIC SYSTEM TESTING <br />I. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490.65. <br />MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED. 23 CCR 2644.1 <br />2. SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490-66 <br />JX 3. SPILL BUCKETS ARE TESTED ANNUALLY. 490.67 <br />VIII. RECORDKEEPING <br />RF following monitoring/maimenance records are kept for this facility: <br />Alarm logs 490.68a ❑ Visual Inspection Records 49D -ab ❑ Tank integrity testing results 490-68e <br />SIR testing results (and supporting documentation records). 490.684 EI Tank gauging results (and supporting documentation records). 49o.6se <br />ATG Testing results (and supporting documentation records). 4go-6sr C3Cormsion Protection 60 -day logs 49a6ss <br />❑ Equipment maintenance and calibration records. 490b8h <br />UL TRAINING <br />® Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 490.66% <br />REFERENCE DOCUMENTS MAINTAINED AT FACILITY (Check all that apply) <br />THIS UNDERGROUND STORAGE TANK MONITORING PLAN (Required) 490.696 <br />12 OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT (Required) 49"% <br />CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 49"9d <br />CALIFORNIA UNDERGROUND STORAGE TANK LAW 490.690 <br />STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br />STATISTICAL INVENTORY RECONCILIATION" 490.69f <br />❑ SWRCB PUBLICATION: "UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 49o•69s <br />❑ OTHER (Specify): M69k ar69i <br />10 This facility has a "Designated UST Operator" who has passed the California UST System Operator Exam administered by the International Code Council (ICC). <br />The "Designated UST Operator" will train facility employees in the proper operation and maintenance of the UST systems annually, and within 30 days of hire. This <br />training will include, but is not limited to, the following: <br />• Operation of the UST systems in a manner consistent with the facility's best management practices <br />• The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br />• The facility employee's role with regard to spills and overfills as specified in the UST Response Pian <br />• Names of contact person(s) for emergencies and monitoring alarms. 490-70 <br />X. CON MWMS/ADDITIONAL INFORMATION <br />Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan. 490-71 <br />GUAn;c41 E ,q ,0-,`j -fe4 t4 Us ds , <br />M. PERSONNEL RESPONSIBILITIES <br />The UST Owner/Operator is responsible for ensuring that: I) the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br />this plan occurs, 2) all conditions that indicate a possible release are investigated, and 3) all monitoring records are maintained properly. <br />The following person )are r,rsponsible for performing the monitoring and equipment maintenance: <br />!6 <br />NAME rr a 49o-72 TITLE 490.75 <br />NAME of f 490-74 TITLE lc 490-75 <br />The Designated Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owner/operator of any <br />conditions that need follow-up action. <br />XII. OWNER/OPERATOR SIGNATURE <br />CERTIFICATION: I certifydiat the information provided herein is true and accurate to the best of my knowledge. <br />APPLICANT SIGNATURE 490-76 <br />DATE: 490-77 <br />— 490-78 <br />APPLICANT NAME (prin2KI <br />APPLICANT TITLE: 490-79 <br />& t <br />UPCF UST -D (12/2007) 314 <br />