Laserfiche WebLink
Alk <br />UNIFIED PROGRAM CONSOLIDATED FO . <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN (Page 2 of 2) <br />VI. UNDER DISPENSER CONTAINMENT (UDC) MONITORING <br />1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-54a <br />111. CONTINUOUS ELECTRONIC MONITORING JK 2. FLOAT AND CHAIN ASSEMBLY ❑ 3. ELECTRONIC STAND-ALONE 490-54b <br />❑ 4. NO DISPENSERS 1199. OTHER (Specify): <br />PANEL MANUFACTURER: x90-45 <br />MODEL #: 490-56. <br />LEAK SENSOR MANUFACTURER: R 490-57 <br />MODEL #(S): 490-58 <br />DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a. YES b. NO —19 <br />UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN❑ a. YES IX b. NO 490-60. <br />FAILURE / DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. INr b. NO 49041 <br />&a.YES <br />UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER a. YES ❑ b. NO 490.62 <br />2. UDC CONSTRUCTION IS E'1. SINGLE -WALLED ❑ 2. DOUBLE -WALLED 49043 <br />IF DOUBLE WALLED: 490-64a <br />UDC INTERSTITIAL SPACE IS MONITORED BY: 1. LIQUID 2. PRESSURE 13 3. VACUUM <br />A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a. YES ❑ b. NO 490.64b <br />VII. PERIODIC SYSTEM TESTING <br />1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 49x65. <br />N ELD,J MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED. 23 CCR 2644.1 <br />2. SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490.66 <br />3. SPILL BUCKETS ARE TESTED ANNUALLY. 497 <br />VIII. RECORDKEEPING <br />The following monitoring/maintenance records are kept for this facility: <br />Alarm logs 490.68a ❑ Visual Inspection Records 490.68b ❑ Tank integrity testing results 49048c <br />SIR <br />testing results (and supporting documentation records). 490-68d 0 Tank gauging results (and supporting documentation records). 49a6sc <br />13ATG Testing results (and supporting documentation records). 4Sb-68r 0 Corrosion Protection 60 -day logs 4904sg <br />❑ Equipment maintenance and calibration records. 49o -6&h <br />IX. TRAINING <br />IM Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 49o-6% <br />REFERENCE DOCUMENTS MAINTAINED AT FACILITY (Check all that apply) <br />THIS UNDERGROUND STORAGE TANK MONITORING PLAN (Required) 490-69b <br />OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT (Required) 490.69c <br />CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d <br />❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 49o490 <br />❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br />STATISTICAL INVENTORY RECONCILIATION" 49o49f <br />❑ SWRCB PUBLICATION: "UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 490.698 <br />❑ OTHER (Specify): M69h, M69i <br />UL This facility has a "Designated UST Operator" who has passed the California UST System Operator Exam administered by the International Code Council (ICC). <br />The "Designated UST Operator" will train facility employees in the proper operation and maintenance of the UST systems annually, and within 30 days of hire. This <br />training will include, but is not limited to, the following: <br />➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br />➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br />• The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br />➢ Names of contact person(s) for emergencies and monitoring alarms. 490.70 <br />X. COMMENTS/ADDITIONAL INFORMATION <br />Provide additional comments here or indicate how mangy pages with agddditional information on specific monitoring are attached to this plan. 490-71 <br />gp�rocedures <br />gF <br />LF" / ®'NInc VIILc d /®O e .i d 4 C ,_ <br />XI. PERSONNEL RESPONSIBILITIES <br />The UST Owner/Operator is responsible for ensuring that: I) the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br />this plan occurs, 2) all conditions that indicate a possible release are investigated, and 3) all monitoring records are maintained properly. <br />The following on(s) are responsible for performing the monitoring and equipment maintenance: <br />NAME is ir. •.F /VC, H 490.72 TITLE 490-73 <br />NAME M L 4go-74 TITLE C_ 490-75 <br />The Designated Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owner/openuor of any <br />conditions that need follow-up action. <br />XII. OWNERIOPERATOR SIGNATURE <br />CERTIFICATION: I certify that the information provided herein is true and accurate to the best of my knowledge. <br />APPLICANT SIGNATUgR) 490-76 <br />DATE: 490-77 <br />r <br />(� <br />APPLICANT TITLE: 490-79 <br />APPLICANT NAME (print): 44(1.78 <br />UPCF UST -D (12/2007) 3/4 <br />