Laserfiche WebLink
SWRCB, January 2002 Page of <br />9. SPILL/OVERFILL CONTAINMENT BOXES <br />Facility is Not Equipped With Spill/Overfill Containment Boxes E <br />Spill/Overfill Containment Boxes are Present, but were Not Tested X *See comments <br />Test Method Developed By: ❑ Spill Bucket Manufacturer ❑ Industry Standard -! Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: E Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Equipment Resolution: <br />NIMMSpill Box # Spill Box # Spill Box # Spill Box # <br />Bucket Diameter: <br />Bucket Depth: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time:. <br />Initial Reading (Rj): F1 LZ <br />tz�D <br />Test End Time: <br />Final Reading (RF): S F P 7 2017 <br />Test Duration: <br />Change in Reading (RF -RI): ENV1R0NN,--E'N'FA1_ HEA FH <br />Pass/Fail Threshold or P, ro"T M: , E y T <br />Criteria: <br />Test Result: <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />*Spill/Overfill Containment Boxes tested annually with, Monitoring System Certification. <br />