Laserfiche WebLink
STATE OF ♦' ' <br />STATE WATER RESOURCES CONTROLBOARD <br />UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM <br />COMPLETE A SEPARATE FORM FOR EAC NK SYSTEM. <br />MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT 5 CHANGE OF INFORMATION <br />ONE ITEM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE <br />DBA OR FACILITY NAME WHERE TANK IS INSTALLED: <br />1. TANK DESCRIPTION COMPLETE ALL ITEMS -- SPECIFY IF UNKNOWN <br />�SpURCES <br />P • 1^ <br />9 <br />1 <br />,y. o <br />• C4CIF OR N�� <br />❑ 7 PERMANENTLY CLOSED ON <br />❑ 8 TANK REMOVED <br />A. OWNER'S TANK 1. D. <br />077 <br />B. MANUFACTURED BY: <br />❑ 2 PETROLEUM ❑ 80 EMPTY <br />C. DATE INSTALLED (MO/DAY/YEAR) <br />UNLEADED <br />❑ 4 GASAHOL <br />❑ 1bUNLEADED ❑ 5 JET FUEL ❑ 7 METHANOL <br />D. TANK CAPACITY IN GALLONS: <br />❑ 2 WASTE <br />ILTANK C TE S IFA -1 IS MARKED. COMPLETE ITEM C. <br />A. 1 MOTOR VEHICLE FUEL ❑ 4 OIL <br />B, <br />C ❑ to REGULAR ❑ 3 DIESEL ❑ 6 AVIATION GAS <br />❑ 2 PETROLEUM ❑ 80 EMPTY <br />1 PRODUCT <br />UNLEADED <br />❑ 4 GASAHOL <br />❑ 1bUNLEADED ❑ 5 JET FUEL ❑ 7 METHANOL <br />❑ 3 CHEMICAL PRODUCT a 95 UNKNOWN <br />❑ 2 WASTE <br />2 LEADED ❑ gg OTHER (DESCRIBE IN ITEM D. BELOW) <br />D. IF (A.1) IS NOT MARKED, ENTYWNAME OF SUBSTANCE STORED C. A. S. #: <br />III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A, B, AND C, AND ALL THAT APPLIES IN BOX D AND E <br />A. TYPE OF�Lff <br />1 DOUBLE WALL <br />❑ 3 SINGLE WALL WITH EXTERIOR LINER <br />❑ 95 UNKNOWN <br />SYSTEM <br />❑ 2 SINGLE WALL <br />❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) <br />❑ 99 OTHER <br />1 SINGLE WALL <br />F--]1 BARE STEEL <br />❑ 2 STAINLESS STEEL <br />❑ 3 FIBERGLASS <br />E]4 STEEL CLAD W/ FIBERGLASS REINFORCED PLASTIC <br />B..TANK <br />MATERIAL <br />❑ 5 CONCRETE <br />❑ 6 POLYVINYL CHLORIDE <br />❑ 7 ALUMINUM <br />❑ 8 1009% METHANOL COMPATIBLE W/FRP <br />(Primary Tank) <br />❑ 9 BRONZE <br />❑ 10 GALVANIZED STEEL <br />❑ 95 UNKNOWN <br />❑ 99 OTHER <br />❑ 1 RUBBER LINED <br />❑ 2 ALKYD LINING <br />F --j 3 EPDXY LINING <br />❑ 4 PHENOLIC LINING <br />C. INTERIOR <br />❑ 5 GLASS LINING <br />❑ 6 UNLINED <br />❑ 95 UNKNOWN <br />❑ 99 OTHER <br />LINING <br />IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? <br />YES_ NO <br />. CORROSION <br />❑ 1 POLYETHYLENE WRAP <br />❑ 2 COATING <br />❑ 3 VINYL WRAP <br />❑ 4 FIBERGLASS REINFORCED PLASTIC <br />PROTECTION <br />❑ 5 CATHODIC PROTECTION <br />❑ 91 NONE <br />O 95 UNKNOWN <br />❑ 99 OTHER <br />E. SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED (YEAR) <br />OVERFILL PREVENTION EQUIPMENT INSTALLED (YEAR) <br />IV. PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IFUNDERGROUN4BOTH IFAPPLICABLE <br />A. SYSTEM TYPE <br />A U <br />1 SUCTION <br />A U <br />2 PRESSURE <br />A U 99 OTHER <br />B. CONSTRUCTION <br />A U <br />1 SINGLE WALL <br />A U <br />2 DOUBLE WALL A <br />3 LI R NCH A U 95 UNKNOWN A U 99 OTHER <br />C. MATERIAL AND <br />CORROSION <br />PROTECTION <br />A U <br />A U <br />A U <br />1 BARE STEEL <br />5 ALUMINUM <br />9 GALVANIZED STEEL <br />A U <br />A U <br />A U <br />2 STAINLESS STEEL A U <br />6 CONCRETE A U <br />10 CATHODIC PROTECTION <br />3 POLYVIN L CHLORIDE (PVC) A UERGLA PIPE <br />7 STEEL W/ COATING A U 8 100% OL COMPATIBLE W/FRP <br />A U 95 UNKNOWN A U 99 OTHER <br />D. LEAK DETECTION <br />❑ 1 <br />AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING ❑ 3 INTERSTITIAL MONITORING ❑ 99 OTHER <br />I. TANK LEAK DETECTION `' <br />❑ 1 VISUAL CHECK ❑ NVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING a 4 AUTOMATIC TANK GAUGING ❑ 5 GROUNDWATER MONITORING <br />❑ 6 TANK TESTING 7 INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br />VI. TANK CLOSURE INFORMATION <br />1. ESTIMATED DATE LAST USED (MO/DAY/YR) 2. ESTIMATED QUANTITY OF 3. WAS TANK FILLED WITH YES ❑ NO <br />SUBSTANCE REMAINING GALLONS I INERT MATERIAL ? <br />THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY, AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br />APPLICANTS NAME DATE <br />(PRINTED 8 SIGNATURE) <br />STATECOLINTY# JURISDICTION # FACILITY # TANK # F-1, 6y <br />I rPERMTINUMBER PERMIT APPROVED BY/DATE l-R.2RMIT EXPIRATION DATE <br />,. �� .■■ .■��� ■■■■Ili© <br />FORM B (7-91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION . FORM A, UNLESS A CURRENT FORM A HAS BEEN FILED. <br />it0 FOR00348-RS <br />'A <br />