Laserfiche WebLink
I ' <br />UST SYSTEM DRAWING INFORMATION <br />1. <br />__04- 04- . x I 0 <br />� w <br />Three complete sets of plans (include manufacturer's specification sheets for proposed equipment to be installed). <br />2. <br />✓ <br />Plans drawn to scale in non -erasable print. <br />3, <br />✓ <br />Plot plan to show location of tanks and alt associated piping. <br />4. <br />V <br />Striker plates or drop tube -mounted bottom protectors illustrated below all accessible openings. <br />5. <br />Tank cross-sectional diagram. <br />6. <br />UIVI.ei'(�fn. UN�.CZ�.. tilt UNt__RF-c.. <br />Detail of tank, associated piping, excavation and cover. <br />7. <br />✓ <br />Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, Chapter 16, <br />U.L. LISTED <br />Article 3, Section 2631 (b) & 26351 <br />3, <br />_✓ <br />verification of product compatibility with the tank(s), piping, monitoring <br />device(s), epoxy or silicone glues, etc. <br />9. <br />1-, <br />Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. <br />10. <br />✓ <br />At the installation site, prior to installation, a tightness test shalt be performed on both primary (10) and <br />secondary (20) containment systems before covering. [Section 2635 (a) (3) & (4)] <br />11. <br />Tank integrity test required upon completion of installation with tank in operating condition. Test results to be <br />_✓ <br />sucenitted directly to PHS-EHD from the testing company or owner of facility. (Health & Safety Code, Division 20, <br />Chapter 6.7, Section 25291 (h)] <br />.1 <br />TAYI rrmcelCTTTM1 <br />TANK x <br />__04- 04- . x I 0 <br />� w <br />CAPACITY <br />000 12 X000 x,000 rJ�ao(:7 <br />MANUFACTURER <br />COMPOSITION <br />ISTI, / F - -� <br />MODEL <br />PRODUCT <br />UIVI.ei'(�fn. UN�.CZ�.. tilt UNt__RF-c.. <br />CORROSION PROTECTION <br />U.L. LISTED <br />COMPATIBILITY WITH 100% <br />METHANOL <br />13. TANK(s) TO 3E INSTALLID Xl j/J(^ --rtj Py—__ M A-trJ <br />A. Steel -clad with fiberglass reinforced plastic coatings, composites, or equivalent.non-metaltic exterior <br />coatings or coverings. <br />(1) Tested at the installation site using an electric resistance holiday detector. <br />(2) vacuum applied to interstitial space. <br />3. Fiberglass <br />(1) Installation instructions require an air test and soap bubble test prior to installation. <br />(2) Vacuum applied to interstitial space. <br />(3) Hydrostatic annular (primary tank pressure test). <br />C. Non -clad steel tank [Section 2635 (a) (2) (A)] <br />(1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br />etc.). <br />_ (2) Field installed cathodic protection systems designed and certified as adequate by a <br />corrosion specialist. <br />(3) Impressed current systems to be inspected no less than every 60 days. <br />N <br />