My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2004-2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HUNTER
>
642
>
2300 - Underground Storage Tank Program
>
PR0231148
>
COMPLIANCE INFO_2004-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2021 2:12:29 PM
Creation date
6/23/2020 6:44:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004-2008
RECORD_ID
PR0231148
PE
2361
FACILITY_ID
FA0000799
FACILITY_NAME
STOCKTON MOBIL #1
STREET_NUMBER
642
Direction
N
STREET_NAME
HUNTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13906035
CURRENT_STATUS
01
SITE_LOCATION
642 N HUNTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231148_642 N HUNTER_2004-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
361
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Alo"i;tOY169 System Certification <br />Site Address: y N i 1 oo �e,r } Date of'resting I / <br />'F. In -Tank Gauging/ SIR Equipment:❑ Check this box if tank gauging is used only for inventorycontrol. <br />Check this box if no tank gauging or SIR equipment is installed. <br />s <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination, including tes <br />❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes ❑ No* Was accuracy of system product level readings tested? <br />❑ Yes ❑ No* Was accuracy of system water level readings tested? <br />❑ Yes ❑ No* Were all probes reinstalled properly? <br />❑ Yes ❑ No*Were all items on the equipment manufacturer's maintenance checklist completed? <br />* in the Section H, below, describe how And when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed <br />mplete the following checklist: <br />Yes ❑ No* For equipment start-up or annual equipme t certification, was "a leak simulated to <br />❑ N/A (Check all that apply) Simulated leak rate: 3 g.p.h.; ❑ 0.1 g.p.h ; ❑ 0.2 g.p.h. <br />for ground faults? <br />LLD performance? <br />4 Yes <br />113 No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />Yes <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />❑ Yes <br />❑ No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />Pr N/A <br />Yes <br />❑ No* 7] <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />❑ N/A <br />®' Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />❑ N/A <br />or disconnected? <br />X Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br />❑ N/A <br />malfunctions or fails a test? <br />r Yes <br />❑ No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />❑ N/A <br />3' Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />I. Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.