Laserfiche WebLink
a Site Address: �r�.�t iia af�of'I'estinglServicing: �. , <br />F. In -Tank Gauging / SIR Equipment: O Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />Li Y es <br />U <br />No -as <br />aii input wiring been inspected or proper entry and termination, including testing for ground faults? <br />❑ Yes <br />L3 <br />No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes <br />❑ <br />No* <br />Was accuracy of system product level readings tested? <br />❑ Yes <br />' ❑ <br />No* <br />Was accuracy of system water level readings tested? <br />❑ Yes <br />❑ <br />No* <br />Were all probes reinstalled properly? <br />❑ Yes ❑ No* <br />i1' in tha Rnrtinn N <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />hal.,. .la :1... 1. .1 .11, al. .1_ ------ <br />_ ___ -, _ _____�_ ___.. ____— .. .. _.. ......... .............�e..0 ..v•.. vl v�lll V4 \:VI Il:l ll'U. <br />G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />Comnlete the followinu checklid! <br />a.cl,clulm va vvCle Ur wm Ue currectea. <br />H. Comments: <br />❑ <br />No* <br />For equipment start-up or annual equipment ce tion, was a leak simulated to verify LLD performance? <br />❑ <br />N/A <br />(Check all that apply) Simulated leak rate: 3 g.p.h.; ❑ 0.1 g.p.h ; ❑ 0.2 g.p.h. <br />FLOYes <br />❑ <br />No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />EJ <br />❑ <br />No* <br />Was the testing apparatus properly calibrated? <br />❑ a* <br />® Al/A <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />Yes <br />❑ <br />No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />❑ <br />N/A <br />EJ Yes <br />❑ <br />No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />❑ <br />N/A <br />or disconnected? <br />Yes <br />❑ <br />No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br />❑ <br />N/A <br />malfunctions or fails a test? <br />15 Yes <br />❑ <br />No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />❑ <br />N/A <br />Yes <br />❑ <br />No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />+t in tha Cant:.... W 1-1- .. _J....__el__ a_ - __ _I __-'- -.. .. ... -_- _ <br />a.cl,clulm va vvCle Ur wm Ue currectea. <br />H. Comments: <br />