Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- age 1 of 2 <br /> TYPE OF ACTION 21T.NEW PLAN [12.CHANGE OF INFORMATION 490-1. <br /> PLAN TYPE 99-1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2. <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) 1 -111 IIIE: <br /> BU INESS NAME(Same as Facility Name or DBA) 3 <br /> eA)c.(P c N(1 i`(l to C s <br /> BUSINESS SITE ADDRESS 103, 1 CITY 104. <br /> 1G/C j4wry.. <br /> H. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> bxthe_equipment manufacturers'instructions,or annually,whichever is more frequent.Such work must be performed by qualified personnel.[23 CCR§2632,2634,2638,2641] <br /> 490.3& <br /> MONITORING EQUIPMENT IS SERVICED M'T ANNUALLY ❑ 99.OTHER(Specify): 490-3b. <br /> M. MONITORING LOCATIONS <br /> ❑ 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ®'2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED490-0. <br /> [23 CCR§2632,2634] <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (check-" <br /> CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490-5. <br /> WITH AUDIBLE AND VISUAL ALARMS.[23 CCR§2632,26341 <br /> SECONDARY CONTAINMENT IS: [$�C DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 490-6. <br /> PANEL MANUFACTURER: (, D EfL 490-7 MODEL#: .04 ��S 3 90-8, <br /> LEAK SENSOR MANUFACTURER: /�"[�"�,� O Y 490-9. MODEL#(S): ��-/'� 490-10 <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).[23 CCR§26431 490.11. <br /> PANEL MANUFACTURER: 490-12. MODEL#: 490-13. <br /> IN-TANK PROBE MANUFACTURER: 490-14. MODEL#(S): 490-15. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-I6. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17. <br /> 490-18. <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): 490-19. <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION 123 CCR§2646.11 490-20. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)123 CCR§26451 TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS49x21. <br /> 490-21 <br /> ❑ 5.TANK INTEGRITY TESTING PER[23 CCR§2643.11 490-23. <br /> 490-24. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 490-25. <br /> ❑ <br /> 99.OTHER(Specify): 490-26.- <br /> a90-7.7. <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) r0-ht,,k Ill <br /> EjT CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 490-28. <br /> g1 CC SECONDARY CONTAINMENT IS: [�a.DRY Elb.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER CUUM 490-29. <br /> PANEL MANUFACTURER: v L-'�D CA ®l 490-30. MODEL#: �f®S 'r3 490-31 <br /> LEAK SENSOR MANUFACTURER: jZ ®T 412. MODEL#(S): 'dN'® 490-33. <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. a.YES ❑ b.NO 490-34. <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. 9-15.YES ❑ b.NO 490-35. <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF 490-36. <br /> PRODUCT FLOW WHEN A LEAK ISDETECTED.[23 CCR§2636] / <br /> MLLD MANUFACTURER(S): �49aa7. MODEL#(S): y L-® 49x38. <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.123 CCR§26361 490-39, <br /> ELLD MANUFACTURER(S): 490-40. MODEL#(S): 49041. <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 49042. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 490-43. <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 490-0-4. <br /> ❑ 4.PIPE INTEGRITY TESTING. 490-45. <br /> TEST FREQUENCY: ❑ a.ANNUALLY [3490-46. <br /> b.EVERY 3 YEARS ❑ c.OTHER(Specify) 490,{7. <br /> ❑ 5.VISUAL PIPE MONITORING. 49048. <br /> FREQUENCY: ❑ a.DAILY ❑ b.WEEKLY ❑ c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 49049. <br /> *Allowed for monitoring of unburied emergency generator fuel ung only Per HSC <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.[23 CCR§2636(x)(3)] 490-50. <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 490-51. <br /> El99.OTHER(Specify) 49x52. <br /> 49453. <br /> UPCF UST-D(12/2007)-1/4 www.unidoes.org <br />