Laserfiche WebLink
a I <br /> Ank Alk <br /> PREC'VMMW <br /> INDUSTRIES 1041 S. PERSHING AVE., STOCKTON, CALIFORNIA 95206 <br /> 209/462-9911 NO. CALIF. 800/332-5900 FAX 209/462-2024 <br /> CALIFORNIA STATE LIC. 467293 <br /> VNc <br /> APPROVED <br /> April 2, 1990 <br /> Approval of these plans extends only to <br /> that which is shown and described hereon, but <br /> SAN JOAQUIN COUNTY PUBLIC HEALTH SERVICES does not authorize or approve any omission <br /> EWIROnvEI]TAL HEALTH DEPARTMENT or deviation of requirements of State laws <br /> P.O. BOX 2009 or local Ordinances. <br /> STOCKTON, CA. 95201 <br /> One set of approved plans shall be available <br /> on the project site at all times. <br /> SUBJECT: QUIK STOP #120 <br /> 9321 N. THORNTON ROAD SAN JOAQUIN COUNTY <br /> STOMON, CA. PUBLIC HEALTH SERVICES <br /> ENVIRONMENTAL HEALTH DIVISION <br /> AT ENTIOra: KASEY FOLEY STOCKTON, CALIFORNIA <br /> (209)465-3420 <br /> Dear Kasey, nate J �� 6y <br /> Our firm has been hired to remove the existing 2" F.R.P. product <br /> and phase II vapor recovery piping and install new "Smith" 2" F.R.P. piping. <br /> To accomplish this we will do the following: <br /> 1) Expose and remove existing piping. Piping will be manifested <br /> and hauled for disposal by Erickson Inc. Richmond, CA. <br /> 2) Dig and regrade trenches at island to proper depth. Dirt <br /> shall be set on visqueen and arrangements made with SJCEHD <br /> for inspection and sample points. After review of soil <br /> sample analysis, soil will be dealt with accordingly. <br /> 3) Trenches will be bedded with pea gravel and proper grade of <br /> 1/4" fall per foot will be established- <br /> 4) Install 2" Smith F.R.P. piping. Note: (a) Steel mechanical <br /> swing joints shall be used at the turbine end of the piping- <br /> ie black steel pipe for the diesel line and galvanised steel <br /> pipe for the gasoline lines. <br /> (b) Under the dispensers Resistoflex flex connectors will be <br /> used. <br /> (c) New O.P.W. 10 R.U. impact valves with universal stabilizer <br /> bars will be installed. <br /> 5) Air test lines to min. 12 times operating pressure of system. <br /> Arrange for SJCEHD and Stockton Fire Department to observe test. <br />