Laserfiche WebLink
19. Piping (cross - sectional Gram, including connections to tank and disers). <br />(A) Vent and tank riser primary containment system equipped with overfill prevention system that: <br />Restricts delivery of flow to tank [Section 2635 (b) (2) (B) or (C)], or <br />T Provide positive shut off of flow to the tank at no more than 95 % [Section 2635 (b)(2)(C)], or <br />(B> V Vapor recovery piping designed so it cannot contain liquid phase product, or <br />(C) Suction piping (below grade piping operates at less than atmospheric pressure) [Section 2636 (a) (3)] <br />Sloped so contents of the pipe will drain back into the storage tank if the suction is <br />released. <br />No valves or pumps installed below grade. <br />Inspection method provided to demonstrate compliance with section 2636 (a) (3). <br />Njf,�r- (D) _ Corrodible underground piping protected against corrosion (Section 2636 (b)). <br />(E) Underground primary piping will meet all of the following requirements / <br />V Primary piping in contact with hazardous substance under normal option conditions shall be: <br />installed inside a secondary containment system in the form of: 0 secondary pipe_Vault or <br />_lined trench to be sloped to a collection sump at the low point of the piping. <br />Primary piping and secondary containment systems will be installed in accordance with industry <br />code of practice and voluntary consensus standards.. <br />lined trench used as secondary containment <br />Material compatible with the substance stored. <br />Covered and capable of supporting any expected vehicular traffic. <br />(F) Underground piping with secondary containment will be equipped and monitored as follows: <br />V Secondary containment will be equipped with a continuous monitoring system connected to an audible <br />/ and visual alarm system. <br />✓ Automatic line leak detectors will be installed on pressurized piping <br />Manufacturer: VA-POO--C-SS Model: L0 "L' O <br />Annual monitoring will be conducted on the pressurized piping with secondary containment. <br />Annual line tightness test will not be required if the continuous monitor shuts down the pump and <br />activates the alarm system when a release is detected and when the continuous monitoring system <br />fails or is disconnected. <br />20. '�/ State Water Resources Control Board "Facility (A)" and "Tank Permit (B)" application forms submitted. <br />21. ✓ Plan review and operating permit fees paid. <br />22. ✓ What is the approximate depth to ground water: <br />(include source of information - borehole logs, monitoring well data, water <br />studies, etc.) <br />6e"M �oo��.'.� Ga. t f aF P�6/i'� (,var�B- - Floyd Congo/ Sccr�i�n �t�6�ic4dion5 <br />23. Total number of tanks an site after installation: <br />24. ✓ County/City Fire District and Building Department notified. ► (� <br />25. 1Z In the event contamination is observed, confirmed or suspected as a result of a leaking UST system it is your <br />responsiity [in accordance with (CCR) Title 23, Division 3, Chapter 16, Article 11, Corrective Action <br />Require nt ] as an owner or operator to submit a workplan to PHS-EHD Site Mitigation Unit prior to initiating any <br />assessm.nt r remediation activities. For further assistance contact the Site Mitigation Unit at (209) 469-3450. <br />T e own gL <br />must acknowledge this responsibility for workplan submittal by signature and date below. <br />Name 1 Z>Arlt-lam 1i�JitIe hIL4,{-� _ peE-Pl _ MG, 0— Date 'J O Iq cit <br />CONDITIONS OF APPROVAL: <br />E <br />