My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-1999 DOUBLE CHECK
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
9321
>
2300 - Underground Storage Tank Program
>
PR0231261
>
COMPLIANCE INFO_1996-1999 DOUBLE CHECK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 1:41:53 PM
Creation date
6/23/2020 6:45:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-1999 DOUBLE CHECK
RECORD_ID
PR0231261
PE
2361
FACILITY_ID
FA0002890
FACILITY_NAME
QUIK STOP MARKET #2120*
STREET_NUMBER
9321
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
STOCKTON
Zip
95209
APN
080-180-05
CURRENT_STATUS
01
SITE_LOCATION
9321 N THORNTON RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231261_9321 N THORNTON_1996-1999 DOUBLE CHECK.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEPTEMBER 24, 1996 <br /> TO: UST FILE 9321 THORNTON ROAD <br /> FROM: JERRY YOSHIOKA, RENS <br /> SUBJECT: UST INSTALLATION <br /> On September 23, 1996, 1 was asked by Michael Kith, SR. RENS, to <br /> witness the setting of two underground storage tanks at 9321 <br /> Thornton Road. I inquired on the manufacturer of the tank and <br /> was told that the two tanks were XERXES tanks with brine-filled <br /> secondary containment. I requested and received the installation <br /> plans and the manufacturer's installation information. I <br /> inquired about the pre-installation testing and was told that a <br /> pressure test of 5 psig for 30 minutes of the primary tank was in <br /> order. <br /> On September 24, 1996, 1 arrived at the site at 0945 hours and <br /> met Ron Williams of Wilkey Engineering. We waited for 15 minutes <br /> for the crane to arrive. I asked Mr. Williams about the pre- <br /> installation pressure testing of the primary tank and was told <br /> that "Mike Kith waived the primary test due to the brine-filled <br /> secondary", therefore he was unprepared for the test. I informed <br /> him of my discussion with Mike K. on the previous day regarding <br /> the intent for a pre-installation test. I was unable to locate <br /> any reference to the waiving of the primary tank in the file, <br /> however Mr. Williams was adament that Mike had agreed about the <br /> waiver. I informed Mr. Williams that since he did not bring the <br /> compressor and fittings for the pressure testing based on his <br /> understanding with Mike, he could set the tanks after the outer <br /> tanks had been inspected. The primary tanks would then be <br /> pressure tested in the excavation the following day. <br /> I informed Mr. Williams that if Mike Kith had not agreed to the <br /> waiving of the testing then he may be required to remove the <br /> tanks from the excavation and/or that the installation permit may <br /> be revoked. He said that "that won't happen because I will take <br /> it to court because Mike agreed to waiving the primary test. " <br /> As of 1120 hours, Wilkey Engineering was to make an appointment <br /> with the office for an inspection as early as possible for <br /> September 25, 1996, for the primary pressure testing. <br /> ct, Froc) <br />
The URL can be used to link to this page
Your browser does not support the video tag.