Laserfiche WebLink
8. a. Describe the method that will be utilized to purge and/or inert the tank(s): <br />b. T ipingauler.. ® 0 , <br />Name <br />Address City Zip <br />Phone <br />Hauler Registration * (if hauled as hazardous) <br />C. T iping Disposal Site: f5 "r- n , <br />Name <br />Address City Zip <br />Phone <br />A EM (if transporteditt D facility) <br />1. Describe, in detall, how the soll anwater sample(s) beneath the tank and piping will be obtained: <br />1. Describe how the excavationwill c l th suitable erial uponremoval: <br />G J Ito <br />11. Handling of excavatedl: <br />a) What material will be used to line the tank pit and cover the stockpile? <br />a i <br />i What will <br />bethe a destination of r" e stockpO R5i r <br />c) Contaminated Soil Hazardous Waste Hauler "4-0 WF— ©IM- 0 , <br />Name Haulw Registration <br />Address City_ Zip <br />Phone No. ( ) <br />Page 5 <br />