My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2012 DOUBLE CHECK
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
9321
>
2300 - Underground Storage Tank Program
>
PR0231261
>
COMPLIANCE INFO_2009-2012 DOUBLE CHECK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 1:56:44 PM
Creation date
6/23/2020 6:45:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2012 DOUBLE CHECK
RECORD_ID
PR0231261
PE
2361
FACILITY_ID
FA0002890
FACILITY_NAME
QUIK STOP MARKET #2120*
STREET_NUMBER
9321
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
STOCKTON
Zip
95209
APN
080-180-05
CURRENT_STATUS
01
SITE_LOCATION
9321 N THORNTON RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231261_9321 N THORNTON_2009-2012 DOUBLE CHECK.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Qul*k Stop rets, Inc. <br /> 4567 Enterprise Street•Fremont,CA 94538•(510)657-8500•Fax:(510)657-1544 <br /> August 10,2010 <br /> VIA EMAIL <br /> Garrett Backus <br /> San Joaquin County Env.Health Dept. <br /> 600 East Main Street <br /> Stockton, CA 95202-3029 <br /> Re: UST Inspection <br /> Quik Stop Market#120 <br /> 9321 North Thornton Road, Stockton <br /> Dear Inspector Backus: <br /> In response to your inspection report dated 5/18/10(copy attached),the following <br /> documents and/or comments,are enclosed: <br /> 1. Return to Compliance Certification. <br /> 2. A review of the July'09 repair dispatch logs or work orders did not reveal <br /> any reference to L2,L3,or L4 sensor out alarms on 7/28/09,nor was there <br /> any reference to L3 or L4 sensor out Alarms on 8/19/09. The work <br /> order/invoice for the L3 alarm on 9/14/09,and the work order for the L3 <br /> alarm on 1/8/10 are attached. Walton Engineering(the D.O.)has been <br /> cautioned about noting all alarms on the monthly inspection records, even <br /> those suspected of being spurious probe signals. <br /> 3. The 5/6/10 D.O. Report showing 7/17/09 as the SB-989 test date is <br /> partially correct. That was the date that secondary containment testing(91 <br /> STP sump only)was completed. All other system components passed on <br /> 6/23/09. According to my records,the actual due date for SB-989 testing <br /> was August 2010. <br /> 4. The drums of hazardous waste on-site at the time of inspection were <br /> picked up for disposal on 6/23/10. This includes 87 and 91 fill sump <br /> water removed at the time of inspection. Copies of the manifests and <br /> recycling certificates for both the solid and liquid hazardous waste on-site <br /> at the time of inspection,are enclosed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.