My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018 DOUBLE CHECK
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
9321
>
2300 - Underground Storage Tank Program
>
PR0231261
>
COMPLIANCE INFO_2013-2018 DOUBLE CHECK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 2:01:09 PM
Creation date
6/23/2020 6:45:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018 DOUBLE CHECK
RECORD_ID
PR0231261
PE
2361
FACILITY_ID
FA0002890
FACILITY_NAME
QUIK STOP MARKET #2120*
STREET_NUMBER
9321
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
STOCKTON
Zip
95209
APN
080-180-05
CURRENT_STATUS
01
SITE_LOCATION
9321 N THORNTON RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231261_9321 N THORNTON_2013-2018 DOUBLE CHECK.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r-1 <br />0 2015 Walton Engineering, Inc. <br />SECONDARY LINE TESTING <br />-mAY o 7 2015 <br />Test Method By: <br />O Manufacturer <br />• Industry Standard o Professional Engr o Other (see below) <br />Test Method Uses: <br />• Pressure <br />o vacuum o Hydrostatic <br />o Other (see below) <br />Measuring Equipment Used: <br />Pressure Gauge (range 0 to 15 prig) <br />Description <br />Line #1 <br />Line #2 <br />Tank product <br />Gasoline - 91 <br />Gasoline - 87 <br />Pipe manufacturer <br />Smith <br />Smith <br />Pipe material <br />FRP <br />FRP <br />Primary pipe diameter (inches) <br />2 <br />2 <br />Secondary pipe diameter (inches) <br />3 <br />3 <br />Method of secondary pipe isolation <br />Termination Boot <br />Termination Boot <br />Location of secondary pipe isolation <br />Sump <br />Sump <br />Estimated length of piping run (feet) <br />45 <br />55 <br />(include length of branch runs) <br />Wait time for pressure to stabilize (hr:min) :10 <br />:10 <br />Test start time <br />9:40 AM <br />9:42 AM <br />Initial pressure (psig) <br />5.0 <br />5.0 <br />Test end time <br />10:40 AM <br />10:42 AM <br />Final pressure (psig) <br />5.0 <br />5.0 <br />Test duration (hr:min) <br />1:00 <br />1:00 <br />Change in pressure (psig) <br />0.0 <br />0.0 <br />Pass/Fail threshold (psig) <br />0.5 <br />0.5 <br />TEST RESULT <br />PASS <br />PASS <br />Comments: <br />0 2015 Walton Engineering, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.