My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018 DOUBLE CHECK
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
9321
>
2300 - Underground Storage Tank Program
>
PR0231261
>
COMPLIANCE INFO_2013-2018 DOUBLE CHECK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 2:01:09 PM
Creation date
6/23/2020 6:45:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018 DOUBLE CHECK
RECORD_ID
PR0231261
PE
2361
FACILITY_ID
FA0002890
FACILITY_NAME
QUIK STOP MARKET #2120*
STREET_NUMBER
9321
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
STOCKTON
Zip
95209
APN
080-180-05
CURRENT_STATUS
01
SITE_LOCATION
9321 N THORNTON RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231261_9321 N THORNTON_2013-2018 DOUBLE CHECK.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDER DISPLINSER CONTAINMENT DC TEST <br />AN97 2015 <br />Test Method By: o Manufacturer • Industry Standard o Professional Engr o Other (see below) <br />Test Method Uses: o Pressure o vacuum • Hydrostatic o Other (see below) <br />Measuring Equipment Used: INCON TS-STS (Electronic Sump Test System) <br />Dascrintinn nicn it 1/2 nian dt VA <br />UDC manufacturer <br />Bravo <br />Bravo <br />UDC material <br />Steel <br />Steel <br />UDC depth (inches) <br />9 <br />9 <br />Height from UDC bottom to highest <br />Final Probe Reading <br />2.0415 <br />piping penetration <br />Bottom <br />Bottom <br />Height from UDC bottom to lowest <br />Pass/Fail threshold (±0.002 inches /'4 Hr.) <br />0.0020 <br />electrical penetration <br />Bottom <br />Bottom <br />Condition of UDC prior to testing <br />Dry <br />Dry <br />Portion of UDC tested <br />Entire <br />Entire <br />Type of shut -down present <br />Float <br />Float <br />Was sensor removed for testing? <br />N/A <br />N/A <br />Was sensor properly replaced after testing? <br />N/A <br />N/A <br />Depth of water level from UDC bottom (in.) <br />6 <br />Wait time for water level to stabilize (hr:min) <br />:10 <br />Test start time <br />11:10 AM <br />Initial Probe Reading <br />2.0423 <br />Test end time <br />11:25 AM <br />Final Probe Reading <br />2.0415 <br />Test duration (hr:min) <br />0:15 <br />Change in water level (± 0.0000 inches) <br />-0.0008 <br />Pass/Fail threshold (±0.002 inches /'4 Hr.) <br />0.0020 <br />TEST RESULT <br />PASS <br />Comments: <br />0 2015 Walton Engineering, Inc. <br />6 <br />:10 <br />12:20 PM <br />1.9530 <br />12:35 PM <br />1.9523 <br />0:15 <br />-0.0007 <br />0.0020 <br />PASS <br />
The URL can be used to link to this page
Your browser does not support the video tag.