Laserfiche WebLink
Wagner Heights Rd. <br />I• Furnish and install a new Veeder-Root BIR Protocol DIM <br />module <br />• Perform a "cold start" of the Monitoring System, including <br />the ISD mapping and turning over the sensors to create a <br />history. <br />• Perform a formal Monitoring System Certification with a <br />report to the local CUPA. <br />46- <br />Open Parking Lot <br />Legend <br />G Gasoline - 87 <br />• Gasoline - 89 <br />• Gasoline - 91 <br />O Diesel <br />is Vapor <br />O Annular <br />• Submersible Turbine Pump <br />Q TLM Probe <br />' Monitoring System Panel <br />8 Emergency Shut -Off Switch <br />Q Overfill Alarm <br />4 Float & Chain <br />E3 Sump/UDC Sensor <br />,< Interstitial Sensor <br />Vacuum Sensor <br />O Line Leak Detector <br />ISD Flow Meter <br />ISD Pressure Sensor <br />00 Spill Containment Kit <br />R Vapor Recovery VST <br />Canister <br />0 <br />.O <br />.. <br />U <br />K O <br />- <br />fn <br />- <br />O <br />Z <br />3 <br />m � <br />O`D <br />C:) <br />—_ <br />N <br />- <br />r <br />*k <br />m o <br />rn <br />� <br />oQ <br />EU <br />= <br />O <br />CLCN <br />o <br />� Y <br />U <br />