My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018 DOUBLE CHECK
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
9321
>
2300 - Underground Storage Tank Program
>
PR0231261
>
COMPLIANCE INFO_2013-2018 DOUBLE CHECK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 2:01:09 PM
Creation date
6/23/2020 6:45:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018 DOUBLE CHECK
RECORD_ID
PR0231261
PE
2361
FACILITY_ID
FA0002890
FACILITY_NAME
QUIK STOP MARKET #2120*
STREET_NUMBER
9321
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
STOCKTON
Zip
95209
APN
080-180-05
CURRENT_STATUS
01
SITE_LOCATION
9321 N THORNTON RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231261_9321 N THORNTON_2013-2018 DOUBLE CHECK.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FCCEIVED <br />OCT 2 4 2017 <br />5XIL-Vons For Over 20 Years <br />Highest Performance, <br />Most Requested Mechanical Line Leak Detector Built Todayl <br />Any Fuel* <br />- Alcohols, Biodiesel, Aviation, Gasoline,Diesel <br />Any <br />Pump* <br />Pitap-r-ty-nnicinterfacer , i <br />le <br />M <br />NEL.- 11111111110EM <br />Longest Length Pipeline System* <br />Largest Volume <br />integrated CheckValve/ <br />Field Adjustable r • i <br />• { Available! r • <br />ry Certifications for Installatior <br />• Annual Testing" <br />The 99 LD -2000 is the most requested mechanical line leak detector built today. New <br />engineering and the Vmi 2 -year warranty (after installation) make the 99 LD -2000 more <br />attractive to station operators today than ever before. Not only is the 99 LD -2000 less <br />expensive to own, it is faster and less subject to field and line variables than ever before! <br />Integrated In -Line Check Valve / Pressure Relief <br />A leaking check valve in the turbine, defective submersible pump pressure relief, or a defective <br />bypass valve will allow the line system to depressurize, resetting the leak detector. Drain - <br />back into the tank and thermal contraction will cause vapor pockets to form. Vapor pockets <br />increase the length of time it takes for a leak detector to open to full flow. Pump problems <br />such as these result in slow flow and technical support calls. The resulting service costs and <br />customer dissatisfaction all take away from the bottom line - making money. <br />The 99 LD -2000 Is The Only 2" Mechanical Line Leak Detector <br />Capable Of Holding Line Pressure After The Pump Is Off, <br />Even With Pump Component Wear Or Failure. <br />"See Technical Specifications on last page. <br />"Contact factory for details <br />MEM8911 <br />;' U.S. Patent No. 4,966,190 • Designed and Manufactured in U.S.A. <br />%ZWW. <br />
The URL can be used to link to this page
Your browser does not support the video tag.