My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1992-2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ACKERMAN
>
1725
>
2300 - Underground Storage Tank Program
>
PR0231309
>
COMPLIANCE INFO_1992-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2022 2:04:30 PM
Creation date
6/23/2020 6:45:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1992-2001
RECORD_ID
PR0231309
PE
2361
FACILITY_ID
FA0003756
FACILITY_NAME
KISHIDA, GEORGE INC
STREET_NUMBER
1725
STREET_NAME
ACKERMAN
STREET_TYPE
DR
City
LODI
Zip
95240
APN
06219001
CURRENT_STATUS
01
SITE_LOCATION
1725 ACKERMAN DR
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231309_1725 ACKERMAN_1992-2001.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
538
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
nitoring System Certification <br />Site Address: 1725 ACKERMAN DR Date of Testing/Service: <br />F. In -Tank Gauging / SIR Equipment <br />03/21/2001 <br />® Check this box if tank gauging is used only for inventory control. <br />Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in tank gauging equipment is used to preform leak detection monitoring <br />Complete the following checklist: <br />IN Yes <br />❑ No • <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />® Yes <br />❑ No <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />® Yes <br />❑No • <br />Was the accuracy of system product level readings tested? <br />® Yes <br />❑No • <br />Was accuracy of system water level readings tested? <br />® Yes <br />❑No ` <br />Were all probes reinstalled properly? <br />® Yes <br />❑No• <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />G. Line Leak Detectors (LLD) : <br />Complete the following checklist: <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />® Yes <br />E] No * <br />For equipmentstart-up or annualequipmentcertification, was a ea simulatedo vera performance? <br />❑ N/A (Check all that apply) Simulated leak rate: ® 3 g.p.h ❑ 0.1 g.p.h ❑ 0.2 g.p.h <br />® Yes <br />❑ No' <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />® Yes <br />❑ No' <br />Was the testing apparatus properly calibrated? <br />® Yes <br />❑ No' <br />❑ N/A For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ Yes <br />No * <br />® N/A For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />❑ Yes <br />❑ No' <br />® N/A For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br />Yes <br />No • <br />M N/A For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test . <br />❑ Yes <br />❑ No • <br />®N/A or electronic LLDs, have all accessible wiring connections been visually inspected? <br />® Yes <br />❑ No ` <br />❑ N/A ere all items on the equipment manufacturer's maintenance checklist completed? <br />In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: <br />page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.