Laserfiche WebLink
Monitoring System Geritticatiart <br />Uri Monitoring Site Plan <br />TAS HEALTH <br />Site Address: _......_�._ r '1 ._.__._. DEPARTMENT <br />_. <br />Date map was drawn: _1 t /_...7.._i.,.t.,3. <br />It you already have a diagram that shows all required information, you may include It, rather than this page, with your Monitoring System <br />Certification. On your site plan, show the general layout of tanks and piping. Clearly identify locations of the following equipment, it installed: <br />monitoring system control panels; sensors monitoring tank annular spaces, sumps, dispenser pans, spilt containers, or other secondary <br />containment areas; mechanical or electronic tine leak detectors; and in -tank liquid level probes lit used for teak detection). In the space <br />provided, note the date this Site Plan was prepared. <br />Monitoring System Certification Page 4 of 4 12107 <br />2121107 <br />