Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN-PAGE .1'w One form facili <br /> TYPE OF ACTION ❑ 1.NEW PLAN ] 2.CHANGE OF INFORMATION ROS' <br /> I. FACIULM INFP10WION,` <br /> FACILITY ID# (Agency Use Only) 1. <br /> t <br /> BUSINESS NAME(Same as FACILITY NAME) 3. <br /> BUSINESS SITE ADDRESS 103• BUSINESS SITE CITY 104. <br /> II SPIZL CO QL.A"cLODS <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan(HMBP). <br /> ➢ If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shut-off,etc.)and,if necessary,safely remove# <br /> remaining hazardous material from the UST system <br /> Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> A Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds that <br /> it is non-hazardous. Used absorbent material,reusable or waste,will be stored in a properly labeled and sealed container. Waste material shall be disposed of <br /> appropriately. <br /> H Facility personnel will determine whether any water removed from secondary containment systems, or from clean-up activity,has been in contact with any <br /> hazardous material. If the water is contaminated,it will be managed as hazardous waste unless a hazardous waste determination in accordance with 22 CCR <br /> §66262.11 finds that it is non-hazardous. If the water has a petroleum sheen(i.e.,rainbow colors),it is contaminated. A thick floating petroleum layer may not <br /> necessarily display rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc.will not be disposed to storm water systems. <br /> ➢ We will review secondary containment systems for possible deterioration if any of the following conditions occur. <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3. Hazardous material,other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> IIS. SPILI CQNTRQT AND CLEAN=LiP EQUIPMENT <br /> PERIODIC MAINTENANCE:Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> Nuipment is inspected at least monthly,and after each use,supplies are replenished as needed Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ON-SBUT AVAILABLE FOR USE IF NEEDED: (Complete n1v i a licable <br /> EQUIPMENT LOCATION AVAILABILITY <br /> R10. R20. R30. <br /> RI 1. R21. R31. <br /> R12. R22. R32. <br /> R13. R23. R33. <br /> R14. R24. RA <br /> R15. Iv. <br /> `y] �1D (�iDy gs �Q/�7�jQR25. R35. <br /> THE FOLLOWING PERSON(S)IWARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME ( � R40. TITLE R50. <br /> NAME R41. TITLE R51. <br /> NAME R42. TITLE R52. <br /> NAME R43. TITTLE R53. <br /> . MONITQRING INI)II~ATQRS �• f ' _ <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEA is taAS FOL' <br /> ❑1. ADDITIONAL SYSTEM TESTING OR DATA COLLECTION D2. INSPECTION BY QUALIFIED PERSONS ❑3. RECALiblRA'1'ION OF EQUIPMENT R60• <br /> ❑99. OTHER(Specify): R61• <br /> V 15 2`1*1 o <br /> ji <br /> "-S1FfS a i d E`�i 3 moi.. <br /> UN-022B-1/3 www.unldocs-org Rev.04/02/08 <br />