My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ACKERMAN
>
1725
>
2300 - Underground Storage Tank Program
>
PR0231309
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2022 4:20:10 PM
Creation date
6/23/2020 6:45:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231309
PE
2361
FACILITY_ID
FA0003756
FACILITY_NAME
KISHIDA, GEORGE INC
STREET_NUMBER
1725
STREET_NAME
ACKERMAN
STREET_TYPE
DR
City
LODI
Zip
95240
APN
06219001
CURRENT_STATUS
01
SITE_LOCATION
1725 ACKERMAN DR
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231309_1725 ACKERMAN_2013-2018.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Results of Testing/Servicing <br />Software Version Installed: 80.00 <br />Comnlete the following checkli-.t- <br />I <br />Z Yes <br />0 No* <br />Is the audible alarm operational? <br />Z Yes <br />El No* <br />Is the visual alarm operational? <br />®Yes <br />0 No* <br />Were all sensors visually inspected, functionally tested, and confirmed operational'? <br />0 Yes <br />M No* <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br />not interfere with their proper operation' <br />❑ Yes <br />0 No* <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g,, modem) <br />Z N/A <br />operational? <br />0 Yes <br />0 No* <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br />[I N/A <br />monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br />positive shut -down? (Check all that apply) ElSump/Trench Sensors; 0 Dispenser Containment Sensors. <br />Did you confirm positive shut -down due to leaks and sensor failure/disconnection? E] Yes; [I No. <br />r7l Yes <br />M No* <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e., no <br />Z N/A <br />mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br />fill point(s) and operating Properly" If so, at what percent of tank capacity does the alarm trigger? 90 % <br />0 Yes* <br />N No <br />--- <br />Was any monitoring equipment replaced" If yes, identify specific sensors, probes, or other equipment replaced <br />and list the manufacturer name and model for all replacement parts in Section E, below. <br />0 Yes* <br />Z No <br />Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br />0 Product; 0 Water. If yes, describe causes in Section F, below. <br />Z Yes <br />0 No* <br />Was monitoring system set-up reviewed to ensure proper settings? Attach set up reports, if applicable <br />0 Yes <br />0 No* <br />Is all monitoring equipment operational per manufacturer's specifications? <br />*In Section E below, describe how and when these deficiencies were or will be corrected. <br />E. Comments:No Positive Shut Down <br />Precision Line Test will be conducted. <br />Monitoring Certification Test Report <br />2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.