Laserfiche WebLink
D. Results of Testing/Servicing <br />Software Version Installed: 80.00 <br />Comnlete the following checkli-.t- <br />I <br />Z Yes <br />0 No* <br />Is the audible alarm operational? <br />Z Yes <br />El No* <br />Is the visual alarm operational? <br />®Yes <br />0 No* <br />Were all sensors visually inspected, functionally tested, and confirmed operational'? <br />0 Yes <br />M No* <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br />not interfere with their proper operation' <br />❑ Yes <br />0 No* <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g,, modem) <br />Z N/A <br />operational? <br />0 Yes <br />0 No* <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br />[I N/A <br />monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br />positive shut -down? (Check all that apply) ElSump/Trench Sensors; 0 Dispenser Containment Sensors. <br />Did you confirm positive shut -down due to leaks and sensor failure/disconnection? E] Yes; [I No. <br />r7l Yes <br />M No* <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e., no <br />Z N/A <br />mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br />fill point(s) and operating Properly" If so, at what percent of tank capacity does the alarm trigger? 90 % <br />0 Yes* <br />N No <br />--- <br />Was any monitoring equipment replaced" If yes, identify specific sensors, probes, or other equipment replaced <br />and list the manufacturer name and model for all replacement parts in Section E, below. <br />0 Yes* <br />Z No <br />Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br />0 Product; 0 Water. If yes, describe causes in Section F, below. <br />Z Yes <br />0 No* <br />Was monitoring system set-up reviewed to ensure proper settings? Attach set up reports, if applicable <br />0 Yes <br />0 No* <br />Is all monitoring equipment operational per manufacturer's specifications? <br />*In Section E below, describe how and when these deficiencies were or will be corrected. <br />E. Comments:No Positive Shut Down <br />Precision Line Test will be conducted. <br />Monitoring Certification Test Report <br />2 of 4 <br />