Laserfiche WebLink
WREN MONTTORING PROCEDURES <br />UNDERGROUND STORAGE TANK MONITORING PROGRAM <br />This monitoring program must be tit at the UST location at ail times. ne information on this monitoring <br />program are conditions of the cresting permit The permit holder must notify San Joaquin. County <br />Environmental Health Divis = =ne (209) 468-3420 within 30 days of any changes to the monitoring <br />procedures, maks required to obtain approval before making the change. <br />R--t--ftti by sections 2632(d) and 2641(h) CCR <br />Facility Name <br />Facility Address <br />A. Describe the frequenq at performing the monitoring: <br />B. What methods and wm:ament, identified by name and model, will be used for <br />performing the me g: <br />Tank <br />Piping <br />C. Describe the locar:= s) where the monitoring will be performed (facility plot plan <br />should be attached): <br />D. List the name(s) azd =de(s) of the people responsible for performing the monitoring <br />and/or maintaining = equipment: <br />E. Reporting format rionitoring: <br />Tank <br />Piping - <br />F. Descnbe the preve=e maintenance schedule for the monitoring equipment. Note: <br />Maintenance mast ae in accordance with the manufacturers' maintenance schedule <br />but not less than eve. -7, Lmonths: <br />G. Describe the tram necessary for the operation of UST system, including piping, <br />and the monitoring tcn:ipment: <br />