Laserfiche WebLink
Page 2 <br />MONITORING ALTERNATIVE #8: Tank Ga �in <br />Implementation of the monitoring alternative requires that the following circled items <br />be completed by the dates specified. <br />Precision test(s) must be performed by and results submitted <br />to this office within 30 days of the test. _7 <br />Tank gauging must be started immediately. (See instructions above.) <br />If the above compliance dates cannot be met, contact this office prior to the specifi <br />date. I <br />4 <br />5/86 UGT 34 <br />H <br />