Laserfiche WebLink
OFJ <br />Ki <br />- <br />14. - -1 <br />J I &^-% <br />Owner or Dealer <br />15. TANK TO TEST <br />5 A1,I&A <br />Identity by position <br />Grade <br />17. FILL -UP FOR TEST <br />Address <br />IN01 M. <br />/P 00-6 <br />Nominal Capacity <br />Gallons <br />Is there doubt as to True Capacity? <br />See Section "DETERMINING TANK CAPACITY" <br />City <br />L4,4L. 1 <br />State Date of Test <br />Stick Water Bottom <br />before Fill -up Inventory <br />to % In. Gallons <br />Fill up. STICK BEFORE AND AFTER EACH COMPARTMENT DROP OR EACH METERED DELIVERY QUANTITY <br />Tank Diameter <br />Product in full tank (up to fill pipe) <br />18. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK <br />See manual sections applicable. Check below and record procedure In log (26). Water Observation - Well level ^ 0 <br />R Water in tank [:] High water table in tank excavation R Line(s) being tested with LVLLT <br />19. TANK MEASUREMENTS FOR <br />TSTT ASSEMBLY <br />Bottom of tank to Grade ................. <br />Add 30" for 4" L ................. <br />Add 24" for 3" L or air seal ....... <br />Total tubing to assemble Approximate ........ <br />20. EXTENSION HOSE SETTING <br />Tank top to grade* .................................. <br />rr <br />Extend hose on suction tube 6" or more <br />below tank top ................................ <br />*If Fill pipe extends above grade, use top of fill. <br />LOG OF TEST PROCEDURES <br />Stick Readings <br />to % in. Gallons <br />From <br />Bymost accurate Z005V <br />Station Chart <br />Tank Manufacturer's Chart <br />capacity chart available <br />32. Productin <br />Graduate <br />AMM <br />Gallons <br />Company Engineering Data <br />—35. i <br />Thermal <br />Sensor <br />Reading <br />Charts supplied with peetro Tite <br />Computation <br />(" ' I <br />Expansi:!, <br />Contraction - <br />TANK =TETER <br />F-1 Other <br />Stick Water Bottom <br />before Fill -up Inventory <br />to % In. Gallons <br />Fill up. STICK BEFORE AND AFTER EACH COMPARTMENT DROP OR EACH METERED DELIVERY QUANTITY <br />Tank Diameter <br />Product in full tank (up to fill pipe) <br />18. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK <br />See manual sections applicable. Check below and record procedure In log (26). Water Observation - Well level ^ 0 <br />R Water in tank [:] High water table in tank excavation R Line(s) being tested with LVLLT <br />19. TANK MEASUREMENTS FOR <br />TSTT ASSEMBLY <br />Bottom of tank to Grade ................. <br />Add 30" for 4" L ................. <br />Add 24" for 3" L or air seal ....... <br />Total tubing to assemble Approximate ........ <br />20. EXTENSION HOSE SETTING <br />Tank top to grade* .................................. <br />rr <br />Extend hose on suction tube 6" or more <br />below tank top ................................ <br />*If Fill pipe extends above grade, use top of fill. <br />LOG OF TEST PROCEDURES <br />Stick Readings <br />to % in. Gallons <br />Total Gallons <br />ea. Reading <br />dpipe <br />in Inches <br />Stan1®, <br />Level <br />32. Productin <br />Graduate <br />AMM <br />—35. i <br />Thermal <br />Sensor <br />Reading <br />av <br />Astage I <br />[—] Stage 11 <br />21. TEMPERATURE/VOLUME FACTOR (a) TO TEST THIS TANK <br />Observed API Gravity Temp. 6 *F <br />22. Thermal -Sensor reading after circulation 15r /7-3 71( -F <br />digits Nearest <br />23. Digits per *F in range of expected change 3.2/ <br />digits <br />24. Aa 0 04'A .401 P 17 gallons <br />totaltotal quantity in 0 coefficient of expansion for volume change in this tank <br />full tank (16 or 17) involved product per 'F <br />5, 33 V966 - :3.R / = 'r V/ <br />25. .51,4.2 40 12 Tyly$llry This,, <br />volume change per oF (24) Digits per 'F in test Volume change per digit. test <br />Range (23) Compute to 4 decimal places. factor (a) <br />30. HYDROSTATIC 1131. REMEKTS M 34. 38. NET VOLUME jr39. ACCUMULATED <br />IL <br />'0 <br />V <br />PRESSURE VOLUME MEASU TEMPERATURE COMPENSATION CHANGES <br />RECORD TO .01 GAL. USE FACTOR (a) 0 CHANGE <br />CONTROL 11 1 EACH READING <br />I <br />E, <br />28. <br />Record details of setting up <br />and running test. (Use full <br />length of line if needed.) <br />dpipe <br />in Inches <br />Stan1®, <br />Level <br />32. Productin <br />Graduate <br />AMM <br />—35. i <br />Thermal <br />Sensor <br />Reading <br />Change <br />Higher + <br />Lower - <br />(c) <br />- <br />Computation <br />(" ' I <br />Expansi:!, <br />Contraction - <br />09M&NE <br />At Low Level compete <br />Change per Near <br />term ermeria) <br />I <br />TIME <br />(24 hr <br />WIN <br />MIEW <br />11 <br />"MINW-1 <br />WAR", <br />i�Ewm <br />t <br />mi <br />W� lym <br />MISM—N <br />I= <br />MAIM-% <br />I <br />MMI <br />P I <br />111100111111 <br />1 <br />10 0 <br />W <br />;0 <br />9M <br />OMM I <br />Aide <br />11111111131111111 <br />FM <br />iffm <br />10's <br />on <br />FM i <br />I r I <br />DIS <br />11111M.-FMI <br />IME111111111 <br />SHE <br />n. <br />I= -I <br />MI I1111M., <br />on <br />=011111111111111 <br />"I 0M I <br />11011111=111101=11 <br />im''IMIN <br />fflmollmi <br />I <br />I <br />OF <br />M <br />PMA <br />I <br />I <br />mi <br />MI I <br />I <br />elms <br />. <br />�� I <br />ml <br />F P. <br />M I <br />rm- IN <br />MI <br />mimodro"IM1115 <br />M -i <br />MNM <br />rim <br />rim. <br />MIRP <br />111111111111110� <br />nip <br />-ME <br />A, IMME <br />MI <br />INS NOR <br />mi <br />E R, I <br />111111111011 <br />Elp,mm- <br />ES <br />MAN111 <br />I <br />111111111111M. 1111001111111111100111111111 <br />1 <br />1 <br />11MR11111111 <br />0-IRMIFT-M <br />I <br />rj W-0, I <br />MI <br />mim��l <br />IMIMMII�j <br />minimi <br />immi�POW,A"41I <br />! <br />�X' <br />W <br />=fii <br />1170, <br />it111111111111101111i <br />MR. IWI , <br />mi <br />MI <br />11 <br />11 A -i <br />IMAM <br />mi <br />mi <br />1 <br />_9401 <br />W7 WN <br />1==1M11111M <br />A­namsonFr,nT,ng — <br />11 <br />A <br />-71 <br />7 <br />