My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BECKMAN
>
351
>
2300 - Underground Storage Tank Program
>
PR0231310
>
COMPLIANCE INFO_2010-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2022 2:52:45 PM
Creation date
6/23/2020 6:46:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2011
RECORD_ID
PR0231310
PE
2361
FACILITY_ID
FA0003773
FACILITY_NAME
VAN DE POL ENT INC/PACIFIC PRIDE
STREET_NUMBER
351
Direction
N
STREET_NAME
BECKMAN
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04903015
CURRENT_STATUS
01
SITE_LOCATION
351 N BECKMAN RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231310_351 N BECKMAN_2010-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
418
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.7.4 Reinforce seams of the entry area and cutout section by applying five (5) layers of 1.5 ounce <br /> matting,saturated with lining material following by the application of 34 ounce fiberglass woven roving <br /> and lining material.The reinforcing cloth must be tested with silane to ensure compatibility with the lining <br /> material. <br /> 3.7.5 Rub after each application of fiberglass matting to remove any entrapped air bubbles. <br /> 3.8 Final Test <br /> 3.8.1 After all work is completed, tank must be tested to ensure that it is leak-free. <br /> 3.8.2 Pressurize tank with 5 psig (3 psig for tanks over ten feet in diameter). <br /> 3.8.3 Test pressure must hold without fluctuation, for a period of one (1) hour. <br /> The Applicator assumes all responsibility for the selection of IECC products for coating the interior of tanks,for exercising appropriate <br /> safety measures in the application of any such product,for the suitability of such products for any such application including the <br /> durability and safety of any such product. The Applicator shall indemnify and hold IECC harmless for any claim,action,damage or <br /> liability asserted by any third party against IECC because of any IECC product used by the Applicator. <br /> IECC shall not be responsible to anyone for the use of,or reliance upon this recommendation.IECC shall not incur any obligation or <br /> liability for damages including consequential damages arising out of or in connection with the use,interpretation of,or reliance upon <br /> this recommendation.IECC makes no representation,warranty or guarantee in connection with this recommendation,and thereby <br /> disclaims any liability or responsibility for loss or damage from its use. <br /> 2/99 <br /> Page 18 of 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.