My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BECKMAN
>
351
>
2300 - Underground Storage Tank Program
>
PR0231310
>
COMPLIANCE INFO_2010-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2022 2:52:45 PM
Creation date
6/23/2020 6:46:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2011
RECORD_ID
PR0231310
PE
2361
FACILITY_ID
FA0003773
FACILITY_NAME
VAN DE POL ENT INC/PACIFIC PRIDE
STREET_NUMBER
351
Direction
N
STREET_NAME
BECKMAN
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04903015
CURRENT_STATUS
01
SITE_LOCATION
351 N BECKMAN RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231310_351 N BECKMAN_2010-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
418
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 ® Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer 0 Industry Standard 0 Professional Engineer <br /> 0 Other(Spec) <br /> Test Method Used: X Pressure 0 Vacuum 0 Hydrostatic <br /> 0 Other(Spec) <br /> Test Equipment Used:Pressure Gauges in PSI/Nitrogen Equipment Resolution: 1/10-15 PSI <br /> Piping Run#1 Piping Run#2 Piping Run#3 Piping Run#4 <br /> Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith Smith <br /> Piping Diameter: 3" 3" 3" 3" <br /> Length of Piping Run: Approx. 80' Approx.20' Approx. 85' Approx.25' <br /> Product Stored: Dyed Diesel Dyed Diesel Vent Premium 91 Premium 91 Vent <br /> Method and location of Test boot at STP#1 Test boot at Vent Box Test boot at STP#2 Test boot at Vent Box <br /> piping-run isolation: <br /> Wait time between applying 30 Minutes 30 Minutes 30 Minutes 30 Minutes <br /> pressure and starting test: <br /> Test Start Time: 9:50 9:00 9:20 9:10 <br /> Initial Reading(RI): 3 Psi 3 Psi 3 Psi 3 Psi <br /> Test End Time: 10:50 10:00 10:20 10:10 <br /> Final Reading(RF): 3 Psi 3 Psi 3 Psi 3 Psi <br /> Test Duration: 1 Hour 1 Hour I Hour 1 Hour <br /> Change in Reading(RF-Rj): 0 Psi 0 Psi 0 Psi 0 Psi <br /> Pass/Fail Threshold or No Loss in Psi No Loss in Psi No Loss in Psi No Loss in Psi <br /> Criteria: <br /> Test Resalt r..' X"Pass;. " C1 Fael, X Past G3 Faxt ;X,Pass"y, !"fail' k X]Pass", Fail <br /> r y z <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.