Laserfiche WebLink
_#jCjlj!X Employ"Training <br /> Page 2 of <br /> All facility employees have received the required on-the job training within the past year. <br /> All facility employees hired within the past 30 days have received the required on tha job training. <br /> Monthly Insl2ectioKI— <br /> Y N NA Date Dono <br /> Monitoring'system certification(within past 12 months) x6/26/09 <br /> Spill Bucket testing completed(within past 12 months) .77 x 6/26/09 <br /> Leak Detector-mechanical/electronic for most sites(within past 12 months) x 6/26/09 <br /> Tha above are usually done together on an annual basis for local regulator. <br /> Line Tightness(usually upon construction or when no positive shutdown) <br /> Tank Tightness(Usually only after construction or when using SIR) <br /> Secondary containment(SB989)tests have been completed(usually every 3 years) <br /> Other testing or maintenance completed as required, List them below: x 2/2/10 <br /> Test/Maintenance:AQ <br /> Test/Maintenance: <br /> Test/Maintenance: <br /> Comments:EH TESTING SCHEDULED FOR 6/25/10 <br /> items Requiring Follow-up Actions: <br /> Monthly inspection must be conducted by an ICC licensed Designated Operator. <br /> A copy of this checklist must be provided to UST owner or operator,but not to State Water Resources. <br /> Designator Operator must alert the UST owner or operator of any condition-discovered during the monthly <br /> inspection that may require that may require follow-up action. <br /> UST owner or operator must maintain a copy of this monthly inspection and any attachments for the-previous <br /> 12 months. Records must be maintained on-site or, if approved by the local agency, off-site at a readily <br /> available location. <br /> N 'd VO:ZL OLE 6L inr 016199V60Z:xeJ 10d 30 NVA <br />