Laserfiche WebLink
• Q <br /> SWRCB,January 2006 <br /> Spill Bucket Testing Report Form <br /> This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and <br /> printouts from tests(af applicable),should be provided to the facility owner/operator for submittal to the local regulatory agency. <br /> 1. FACILITY INFORMATION <br /> Facility Name: LODI PAC PRIDE Date of Testing: 06-27-11 <br /> Facility Address: 351 N BECKMEN RD LODI CA <br /> Facility Contact: TED Phone: <br /> Date Local Agency Was Notified of Testing: <br /> Name of Local Agency Inspector(af present during testing): SAN JOAQUIN CO ARIS <br /> 2.TESTING CONTRACTOR INFORMATION <br /> Company Name: AFFORDA TEST 416 2nd Street Galt,CA 95632 (209)744-0112 Fax:(209)744-0116 <br /> Technician Conducting Test: ❑Lyle D.Nimmo ❑ Zane A.Nimmo ❑ David A.Winkler N Felix G.Ramirez <br /> 5249115-UT 5263322-UT 5263373-UT 5273934-UT <br /> Credentials': N ICC Service Tech. N SWRCB Tank Tester <br /> 3. SPILL BUCKET TESTING INFORMATION <br /> Test Method Used: N Hydrostatic ❑Vacuum ❑Other <br /> Test Equipment Used: TAPE/H2O Equipment Resolution: 1/16 <br /> Identify Spill Bucket(By Tank 1 DIE NORTH 2 87 3 91 4 RED DIE <br /> Number, Stored Product, etc. <br /> ❑Direct Bury ❑Direct Bury Direct Bury Lj Direct Bury <br /> Bucket Installation Type: ®Contained in Sump N Contained in Sump N Contained in N Contained in <br /> Sump Sum <br /> Bucket Diameter: 11 11 11 11 <br /> Bucket Depth: 13 13 13 13 <br /> Wait time between applying <br /> vacuum/water and start of test: <br /> Test Start Time(TI): 1430 1300 1300 1430 <br /> Initial Reading(RI): 12 12 12 12 <br /> Test End Time(TF): 1530 1400 1400 1530 <br /> Final Reading(RF): 12 12 12 12 <br /> Test Duration(TF—TI): 1 HOUR 1 HOUR 1 HOUR 1 HOUR <br /> Change in Reading(RF-RI): 0 0 0 0 <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Tet:Result. Pass Fait. , ® Pass; Fail N Pass ❑Faii ® Pass ]Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> OPW BUCKETS <br /> WORKED ON DIESEL NORTH AND RED DIESEL TO PASS <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> I hereby certify that all the information contained in this report is true,accurate,and in full compliance with legal requirements. <br /> Technician's Signature: 0 Date:06-27-11 <br /> ' State laws and regulations do not currently require testing to be performed by a qualified contractor.However,local requirements <br /> may be more stringent. <br />