My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BECKMAN
>
351
>
2300 - Underground Storage Tank Program
>
PR0231310
>
COMPLIANCE INFO_2010-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2022 2:52:45 PM
Creation date
6/23/2020 6:46:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2011
RECORD_ID
PR0231310
PE
2361
FACILITY_ID
FA0003773
FACILITY_NAME
VAN DE POL ENT INC/PACIFIC PRIDE
STREET_NUMBER
351
Direction
N
STREET_NAME
BECKMAN
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04903015
CURRENT_STATUS
01
SITE_LOCATION
351 N BECKMAN RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231310_351 N BECKMAN_2010-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
418
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST SYSTEM RETROFIT OR REPAIR <br />(Submit minimum of 33 sets of plans & applications as originals will be retained by EHD) <br />1.. Site map enclosed? YES.T/q� NO [ <br />" 2.. Submit copies of ICC Service Technician and/or Installers certificate and all manufacturer training cerPificates for each <br />person. installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br />Plan' is available on the jobsite as required by Title 8. <br />3. Detailed description of work to be completed. List. components to be repaired o/escribe <br />d: attach a diagram drawn <br />to. scale showing location of repairs and/or.replacements. If repairing, a. componhow this will be done. (Ifadding piping,<UDCs, or other UST equipment, or performing tank top upgradT Installation Application <br />pages 4-8`as necessary for a timely plan "review): <br />ltl r;cl-)� nrbyoclt <br />� dere <br />c <br />t aom <br />lk <br />ICA <br />dCV <br />
The URL can be used to link to this page
Your browser does not support the video tag.