My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BECKMAN
>
351
>
2300 - Underground Storage Tank Program
>
PR0231310
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2022 4:33:55 PM
Creation date
6/23/2020 6:46:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0231310
PE
2361
FACILITY_ID
FA0003773
FACILITY_NAME
VAN DE POL ENT INC/PACIFIC PRIDE
STREET_NUMBER
351
Direction
N
STREET_NAME
BECKMAN
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04903015
CURRENT_STATUS
01
SITE_LOCATION
351 N BECKMAN RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231310_351 N BECKMAN_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
478
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E <br />C <br />Facility Employee Training Page 2 of 2 <br />All facility employees have received the required on-the-job training within the past year. <br />X <br />All facility employees hired within the past 30 days have received the required on the job training. <br />X <br />Monthly Inspection — <br />Y N NA Date Done <br />Monitoring system certification (within past 12 months) X 6-24-16 <br />Spill Bucket testing completed (within past 12 months) X 6-24-16 <br />Leak Detector-mechanical/electronic for most sites (within past 12 months) X 6-24-16 <br />The above are usually done together on an annual basis for local regulator. <br />Line Tightness (usually upon construction or when no positive shutdown) X <br />Tank Tightness (Usually only after construction or when using SIR) X <br />Secondary containment (SB989) tests have been completed (usually every 3 years) X 8-11-14 <br />Other testing or maintenance completed as required. List them below: <br />Test/maintenance: AQMD X 1/14/17 <br />Test/Maintenance: BI ANNUAL V/L 6/24/16 <br />Test/Maintenance: <br />PRINTOUT INCLUDED: Yes ® No ❑ NA❑ PRINTOUT LEFT ON SITE: ® BINDER UP TO DATE: <br />Comments: RAIN WATER ALARMS. L2 91 FILL JAN 18TH FEB 9TH. L8 87 STP FEB 10TH. L5 DSL AB FILL FEB 20TH. L3 87 <br />FILL FEB 12TH. L4 DSL FILL FEB 9TH AND JAN 16TH. <br />:.+rxatn� <br />i <br />Items Requiring Follow-up Actions: <br />ENVIRON"I f - <br />Monthly inspection must be conducted by an ICC licensed Designated Operator. <br />A copy of this checklist must be provided to UST owner or operator, but not to State Water Resources. <br />Designator Operator must alert the UST owner or operator of any condition discovered during the monthly inspection <br />that may require that may require follow-up action. <br />UST owner or operator must maintain a copy of this monthly inspection and any attachments for the previous 12 <br />months. Records must be maintained on-site or, if approved by the local agency, off-site at a readily available <br />location. <br />99/79/75 <br />
The URL can be used to link to this page
Your browser does not support the video tag.