Laserfiche WebLink
e <br />Monitoring System Certification J U L 0 5 2016 <br />UST Monitoring Site Plan <br />Site Address: VAN DE POL 351 N. BECKMAN ROAD LODI CA 95240 <br />HIGHWAY" N --I,. f <br />O <br />O <br />O <br />O <br />O <br />O <br />C <br />O <br />O <br />O <br />-T <br />-T <br />-T <br />-T <br />-T <br />0 <br />X <br />0 <br />X <br />0 <br />o <br />X <br />O <br />Xo <br />oo <br />30ox <br />Date map was drawn: 6-24-16 <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring System Certification. On your site plan, <br />show the general layout of tanks and piping. Clearly identify locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank <br />annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in -tank liquid level <br />probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br />Monitoring System Certification Page 4 of 4 2/21/07 <br />J <br />