Laserfiche WebLink
0 0 REULIVI�L <br />Monitoring System Certification JUL 12016 <br />UST Monitoring Site Plan ENVIRONMENTAL <br />Site Address: VAN DE POL 351 N. BECKMAN ROAD LODI CA 95240 t NCAA r <br />HIGHWAY 99 N -10. <br />O <br />O <br />O <br />O <br />O <br />T <br />T <br />T <br />T <br />T <br />X <br />X <br />O <br />X <br />0 <br />X <br />0 XCOO <br />no <br />Date map was drawn: 6-24-16 <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring System Certification. On your site plan, <br />show the general layout of tanks and piping. Clearly identify locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank <br />annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in -tank liquid level <br />probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br />Monitoring System Certification Page 4 of 4 2/21/07 <br />