Laserfiche WebLink
4RECEIVED <br />SWRCB, January 2002 S E P 0 8rYtW— <br />o'— <br />Secondary <br />f_Secondary Containment Testing Report Form <br />This form is intended for use by contractors performing periodic testing of UST secondary c L <br />TH <br />appropriate pages of this form to report results for all components tested. The completed form, writt '#nd <br />printouts from tests (f applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br />1. FACILITY INFORMATION <br />2. TESTING CONTRACTOR INFORMATION <br />II)d F.11 t 1Mamam <br />Component <br />Pass <br />Fail <br />Not <br />Tested <br />Repairs <br />Made <br />Component <br />Pass <br />Fail <br />Not <br />Tested <br />Repairs <br />Made <br />Annular Tank #1 <br />X <br />❑ <br />❑ <br />❑ <br />Secondary Pipe 48 <br />X <br />❑ <br />❑ <br />❑ <br />Annular Tank #2 <br />X <br />❑ <br />❑ <br />❑ <br />Secondary Pipe #9 <br />X <br />❑ <br />❑ <br />❑ <br />Annular Tank #3 <br />X <br />❑ <br />❑ <br />❑ <br />Secondary Pipe #10 <br />X <br />❑ <br />❑ <br />❑ <br />Annular Tank #4 <br />X <br />❑ <br />❑ <br />❑ <br />Secondary Pipe 411 <br />X <br />❑ <br />❑ <br />❑ <br />Annular Tank #5 <br />X <br />❑ <br />❑ <br />❑ <br />Secondary Pipe #12 <br />X <br />❑ <br />❑ <br />❑ <br />Secondary Pipe 41 <br />X <br />❑ <br />❑ <br />❑ <br />Piping Sump #1 <br />X <br />❑ <br />❑ <br />❑ <br />Secondary Pipe #2 <br />X <br />❑ <br />❑ <br />❑ <br />Piping Sump #2 <br />X <br />❑ <br />❑ <br />❑ <br />Secondary Pipe 43 <br />X <br />❑ <br />❑ <br />❑ <br />Piping Sump #3 <br />X <br />❑ <br />❑ <br />❑ <br />Secondary Pipe 44 <br />X <br />❑ <br />❑ <br />❑ <br />Piping Sump #4 <br />X <br />❑ <br />❑ <br />❑ <br />Secondary Pipe #5 <br />X <br />❑ <br />❑ <br />❑ <br />Piping Sump #5 <br />X <br />❑ <br />❑ <br />❑ <br />Secondary Pipe #6 <br />X <br />❑ <br />❑ <br />❑ <br />Vent Box Sump <br />X <br />❑ <br />❑ <br />❑ <br />Secondary Pipe #7 X ❑ ❑ ❑ Dispenser Sump #1&2 <br />If hydrostatic testing was performed, describe what was done with the water after completion of tests: <br />X <br />❑ <br />❑ <br />❑ <br />Test Fluid Supplied and Recovered for reuse by, R&D Compliance Testing. <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements <br />Technician's Signature: misa�� Date: August 11, 2014 <br />