Laserfiche WebLink
D. Results of Testing/Servicing <br /> VED <br /> Ri <br /> �. <br /> Software Version Installed: 123 . 02 <br /> g <br /> Com tete the followingchecklist: JUL E L 2,018 <br /> ® Yes ❑ No* is the audible alarm operational? <br /> ® Yes ❑ No* is the visual alarm operational? NTAL <br /> ® Yes ❑ No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> - ,... <br /> ® Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment dtihteifere wifh'tlieir proper <br /> operation? <br /> ❑ Yes ❑ No* If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.,modem)operational? <br /> ® N/A <br /> ® Yes ❑ No* For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak, <br /> ❑ N/A fails to operate,or is electrically disconnected? If yes:which sensors initiate positive shut-down? (Check all that apply) ®Sump/Trench Sensors; <br /> ®Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks an sensor failure/disconnection? ®Yes; ❑No. <br /> ❑ Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e., no mechanical overfill prevention valve is <br /> ® N/A installed),is the overfill warning alarm visible and audible at the tank fill point(s)and operating properly? If so,at what percent of tank capacity <br /> does the alarm trigger? % <br /> ❑ Yes ® No Was any monitoring equipment replaced? If yes,identify specific sensors,probes,or other equipment replaced and list the manufacturer name <br /> and model for all replacement parts in Section E,below. <br /> []Yes* ® No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑Product; ❑Water. If yes,describe causes in Section E,below. <br /> ILS Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> Yes ❑ No* Is all monitoring equipment operational per manufacturer's specifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. comments: REPLACED RED DIESEL ANNULAR SPACE SENSOR LIKE FOR LIKE <br /> Monitoring System Certification Page 2 of 4 2/21/07 <br />