Laserfiche WebLink
SWRCB, January 2006 <br />Spill Bucket Testing Report Form <br />This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and <br />printouts from tests (if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br />1. FACTT.TTV TNFORMATTON <br />Facility Name: LODI PAC PRIDE Date of Testing: 6-28-13 <br />Facility Address: 351 N BECKMAN LODI CA <br />Facility Contact: TED <br />Phone: <br />Date Local Agency Was Notified of Testing: 5-15-13 <br />Name of Local Agency Inspector (tfpresent during testing): ARIS <br />2. TESTING CONTRACTOR INFORMATION <br />Company Name: AFFORDA TEST 4162 d Street Galt, CA 95632 (209) 744-0112 Fax: (209) 744-0116 <br />Technician Conducting Test: ❑ Lyle D. Nimmo ❑ Zane A. Nimmo ® David A. Winkler ❑ Felix G. Ramirez <br />5249115 -UT 5263322 -UT 5263373 -UT 5273934 -UT <br />I Credentials': ® ICC Service Tech. ® SWRCB Tank Tester I <br />3. SPILL BUCKET TESTING INFORMATION <br />Test Method Used: ® Hydrostatic ❑ Vacuum ❑ Other <br />Test Equipment Used: H2O & TAPE MEASURE <br />Equipment Resolution: 1/16 <br />Identify Spill Bucket (By Tank 1 DSL <br />Number, Stored Product, etc.) <br />2 91 <br />3 87 <br />4 <br />® Direct Bury <br />Bucket Installation Type: <br />El Contained in Sump <br />® Direct Bury <br />El Contained in Sump <br />® Direct Bury <br />❑ Contained in <br />Sump <br />❑ Direct Bury <br />F1 Contained in <br />Sum <br />Bucket Diameter: 11 <br />11 <br />l 1 <br />Bucket Depth: 13 <br />13 <br />13 <br />Wait time between applying NA <br />vacuum/water and start of test: <br />NA <br />NA <br />NA <br />Test Start Time (TI): 9 <br />9 <br />9 <br />Initial Reading (RI): 12 <br />12 <br />12.75 <br />Test End Time (TF): 10 <br />10 <br />10 <br />Reading (RF): 12 <br />12 <br />12.75 <br />Duration (TF - Tj): 1 HR <br />1 HR <br />1 HR <br />ge in Reading (RF - RI): 0 <br />r <br />0 <br />O <br />Fail Threshold or1/16 <br />ria: <br />1/16 <br />1/16 <br />Test Result: ®Pass <br />❑Fail <br />®Pass []Fail <br />Z Pass [],,Fail <br />E] <br />Pass ❑Fail <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />I hereby certify that all the information contained in this report is true, accurate, and in full compliance with legal requirements. <br />Technician's Signature: V -C -)—i <br />Date: 6-28-13 <br />' State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements <br />may be more stringent. <br />