My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BECKMAN
>
351
>
2300 - Underground Storage Tank Program
>
PR0231310
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2022 4:33:55 PM
Creation date
6/23/2020 6:46:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0231310
PE
2361
FACILITY_ID
FA0003773
FACILITY_NAME
VAN DE POL ENT INC/PACIFIC PRIDE
STREET_NUMBER
351
Direction
N
STREET_NAME
BECKMAN
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04903015
CURRENT_STATUS
01
SITE_LOCATION
351 N BECKMAN RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231310_351 N BECKMAN_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
478
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VM1 7 n <br />9 L.D-2-000-New Series <br />Highest Performance, - <br />wlost- Rego ste l h c_al_l_ _rye-tea�k Qetectorr -Built today! ! <br />• Any Fuel* <br />• Any Pump* <br />• Any Pipeline System* <br />• Longest Length Pipeline System* <br />• Largest Volume Pipeline System* <br />• Integrated Check Valve / <br />Pressure relief <br />*see technical specification <br />1� <br />The.99 LD -2000 <br />The 99 LD -2000 is now the most requested mechanical line leak detector built today. New <br />engineering and the VMI 2 -year warranty (after installation) make the 99 LD -2000 more <br />attractive to station operators today than.ever before. Not only is the 99 LD -2000 less ex- <br />pensive to own, it is faster and less subject to field and line variables than ever pefore! <br />Integrated In -Line Check Valve / Pressure Relief <br />Leaking check valves in the turbine, defective submersible pump pressure relief, or a defec- <br />tive bypass valve will allow the line system to depressurize, resetting the leak detector. <br />Drain -back into the pump or thermal contraction will cause vapor pockets to form. Vapor <br />pockets increase the length of time it takes for a leak detector to open to full flow. Pump <br />problems such as these result in stow flow and technical support calls. The resulting service <br />costs and customer dissatisfaction fall tak. away from the.. bottom line making money. <br />I Capable Of Holding Line Pressure After the Pump is Off— <br />Even With, Pump Component Wear Or Failure. <br />"Patent pending <br />
The URL can be used to link to this page
Your browser does not support the video tag.